Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.

Similar presentations


Presentation on theme: "Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority."— Presentation transcript:

1 Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority

2  Plant Availability Factor of ISGS.  Percentage of Allocated Capacity Share.  Share of Beneficiaries in ISGS.  Misdeclaration of Declared Capacity.  Ratio of Fees of SRLDC to be Shared.  Ratio in which Transmission Charges to be Shared.  Energy Scheduled to the Beneficiaries from ISGS.  Details of Scheduled Energy Wheeled to Other Region.  Details of Short Term Open Access.  Details of Short Term Open Access Through Power Exchange.  Details of Wheeling Charges.

3  PAF-: The Average of the Daily Declared Capacities for all the Days during that period expressed as a percentage of the Installed Capacity in MW reduced by the Normative Auxiliary Consumption.  PAFM/PAFY=10000* DC/(N*IC*(100-AUX) )%

4 TARIFFFixed Cost Return on Equity + O&M + Sec Fuel Cost Interest + Depreciation Running Cost Primary Fuel + O&M

5  Allocated Capacity Share – Gadgill Formula.  Un Allocated Share (15%)

6  Weighted Average of Percentage Allocation Capacity Decides the Ratio in Which Fixed Capacity Charges is to be share by Beneficiaries.

7

8  Ratio in Which SRLDC fees are shared is based on Weighted Average of Total Entitlement of a Beneficiaries with Different ISGS and LTOA

9  Postage Stamp Method- Based on Entitlement.  Point of Connection Method- Based on Hybrid Method ( from 1.7.2011)

10  Running Charges of a Station Recovered through Scheduled Energy.  Concept of Un-Requisition Energy (URS Power).  Concept of Unscheduled Interchange.

11  From Goa SR-Goa WR  From ER-WR Via SR.  Jeypore - Gajuwaka (ER)  Bhadravati - Chandrapur (WR)

12  Short Term Open Access.  Short Term Open Access through Power Exchange  PXI & IEX.

13  ISGS Embedded in State Transmission network KAPS & MAPS.  State Transmission network Connecting Different States.

14  Declared Capacity  Requisition  Schedule  Drawl  Losses  Frequency  Least count of 0.02 Hz Freq= 49+Code/50  UI  De incentive UI  Capped UI (4.08 ps/kwh)  Capping Under APM (4.08 ps/kwh)  Additional UI (49.5-49.2)(49.2-49)

15  No Generators Involved.  Penalty for injecting Reactive Energy at 103% of Voltage Level and Incentive for Drawing.  Penalty for drawing Reactive Energy at 97% of Voltage level and Incentive for Injecting  Reactive charges Rs 10/MVARH.  Payment for Interstate Lines.

16