Download presentation
Presentation is loading. Please wait.
Published byCaren Woods Modified over 9 years ago
1
TBWG Montreal, Quebec October 23, 2013 Greening of the Border Update A Land Port for the 21 st Century Van Buren, Maine
2
Van Buren, Maine May 2008 1960’s era facility Existing port was extensively damaged by flooding in 2008. Is it practical repairing a facility that is over 40 years old?
6
Van Buren, ME The Path Forward Replaced with new, energy efficient high performance facility. Funded in 2009 through the Recovery Act. Construction completed summer 2013.
8
Green Border Features Achieving LEED Gold Energy efficient construction that utilized insulated pre-cast concrete panels. Ground-source geothermal heating and cooling system. Radiant floor heating. Solar hot water heating system Solar tubes for interior space daylighting LED energy efficient lighting
18
A Positive Economic Impact The project generated $10.7M for 25 subcontractors in Maine $3.3M in Aroostook County $1.5M in the Town of Van Buren.
19
Questions? Thank You GSA Office of Design & Construction 18 th & F Street NW Washington, DC 20405 ralph.scalise@gsa.gov Tel: 303-319-9887
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.