1 TBWG Montreal, Quebec October 23, 2013 Greening of the Border Update A Land Port for the 21 st Century Van Buren, Maine

2 Van Buren, Maine May 2008 1960’s era facility Existing port was extensively damaged by flooding in 2008. Is it practical repairing a facility that is over 40 years old?

3

4

5

6 Van Buren, ME The Path Forward Replaced with new, energy efficient high performance facility. Funded in 2009 through the Recovery Act. Construction completed summer 2013.

7

8 Green Border Features Achieving LEED Gold Energy efficient construction that utilized insulated pre-cast concrete panels. Ground-source geothermal heating and cooling system. Radiant floor heating. Solar hot water heating system Solar tubes for interior space daylighting LED energy efficient lighting

9

10

11

12

13

14

15

16

17

18 A Positive Economic Impact The project generated $10.7M for 25 subcontractors in Maine $3.3M in Aroostook County $1.5M in the Town of Van Buren.

19 Questions? Thank You GSA Office of Design & Construction 18 th & F Street NW Washington, DC 20405 ralph.scalise@gsa.gov Tel: 303-319-9887


Download ppt "TBWG Montreal, Quebec October 23, 2013 Greening of the Border Update A Land Port for the 21 st Century Van Buren, Maine."

Similar presentations


Ads by Google