Presentation is loading. Please wait.

Presentation is loading. Please wait.

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1.

Similar presentations


Presentation on theme: "Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1."— Presentation transcript:

1 Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1

2 Anatoli Romaniouk, TRT IB meeting October 30 th 2013 2 Preliminary plan for TRT/ID Meetings in 2014. February TRT meeting 3-5th February TRT institute We. 5thID ID combined 7th February ATLAS week 10-14 February May-June ID commissioning WS May 19 th ATLAS 16-20 June (outside) TRT meeting (outside?), 3 days 26-28 June? October ATLAS 6-10 October (CERN) TRT meetings 14-16 October TRT institute 15th October.I ID commissioning 13 October 2014 Milestone runs: M1: Feb 17-21 M2: March 31-April 4 M3: May 19-23 M4: July 7-11 M5: Sept 8-12 M6: Oct 13-17

3 Anatoli Romaniouk, TRT IB meeting October 30 th 2013 2014 M-Runs: 21 Oc 2013S. Zimmermann, LS1-Weekly3 M1M2M3M4M5M6 PIX X1X1 X2X2 1 ready using events simulated at ROD 2 detector cold IBL X1X1 X2X2 1 ready using events simulated at ROD 2 detector cold SCT X1X1 1 detector cold TRT X LAR X TIL X L1Calo X1X1 (X 1 ) X2X2 (X 2 ) 1 Readout only. 2 Trigger part once LAR/TIL available CSC X1X1 X2X2 1 Old RODs, side A only 2 New ROD MDT X RPC X X provide trigger for M2 or latest M3 TGC X X 2 2 operating gas, trigger BCM X ALFA -- X LUCID -- X TRT starts 31 March-4 April

4 Anatoli Romaniouk, TRT IB meeting October 30 th 2013 2014 Weeks 9 Oct 2013S. Zimmermann, ATLAS Week, Marrakech4 ATLAS out M1-6 ATLAS UpGrade P & P TRT ID TRT+ID ID-WS TRT out TRT+ID ATLAS outside ?

5 Anatoli Romaniouk, TRT IB meeting October 30 th 2013 5 Outside TRT WS 19th – 23rd May – ID Commissioning Workshop on Monday 19th May – ID Week 19-23rd May Uncoupled with ATLAS or upgrade weeks. Chosen because the pixel/IBL installation should be completed and commissioning is underway 13th – 17th October – ID Week, with commissioning workshop on Monday – Directly after ATLAS week at CERN 1.Do we want to have it? 2.When: 26-28 of June? Other time? 3.Where? 4.3 possible places


Download ppt "Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1."

Similar presentations


Ads by Google