Download presentation
Presentation is loading. Please wait.
Published byGeraldine Baker Modified over 9 years ago
1
Research Infrastructures Information Day Brussels, March 25, 2003 Victor Alessandrini IDRIS - CNRS
2
Build a European Grid infrastructure that gives users a seamless, secure access to High Performance Computing resources and that advances computational science in Europe EUROGRID Vision
3
EUROGRID Goals European HPC centers build and run a GRID testbed –Seamless access to HPC resources –Multi-site jobs Interfaces for important applications –Bio-/Chemical –Meteo –CAE Industrial applications and GRID usage scenarios –ASP services for engineers –Intranet solutions for distributed organizations Development of new GRID middleware –E.g. resource broker, efficient data transfer,... Contribute to Global GRID development
4
EUROGRID Partners HPC Centers CSCS Manno (CH) FZ Jülich (D) ICM Warsaw (PL) IDRIS Paris (F) Univ Bergen (N) Univ Manchester (UK) Users Deutscher Wetterdienst EADS T-Systems (debis Systemhaus (Assistant Partner) Volume: 33 person years, 3.5 MEuro cost funded by European Commission Grant No. IST–1999–20247 Integration Pallas (Project Coordinator) Fecit (Assistant Partner)
5
EUROGRID Geography
6
UNICORE Architecture Cray NQEIBM LL UNICORE TSI UNICORE Network Job Supervisor UNICORE Gateway UNICORE Clients User’s Laptop UNICORE TSI UNICORE Network Job Supervisor UNICORE Gateway NEC NJS UNICORE Site B Command or Routine I/F Secure Intranet Insecure Internet UNICORE Site A Virtual Site
7
Bio–GRID Develop interfaces to existing biological and chemical codes Operate a GRID for biomolecular simulations
8
Meteo–GRID Develop a relocatable version of local weather prediction model ASP solution for on demand localized weather prediction
9
Meteo–Grid Ubiquitous access to local weather prediction software, developed at DWD and CSCS WAN DWD EUROGRID center Client workstation (somewhere) Global model Databases Request prediction Request global data Send global data Compute prediction Send results
10
CAE–GRID Coupled simulations of aircrafts (e.g. structure and electromagnetism) Goal: internal HPC portal for EADS engineers
11
CAE–GRID T-Systems (Debis Systemhaus) operates www.hpcportal.de Provide HPC portal to engineers at Daimler– Chrysler and partners Develop GRID technology for computing cost estimates and billing
12
HPC–GRID HPC centers agree on authentification policy HPC centers provide HPC platforms –First phase: Dedicated test systems –Later: Production systems Variety of platforms and batch subsystems: –IBM SP –NEC SX –Cray T3E –SGI O2K, O3K –Intel-/Linux-cluster –Alpha-/Linux-cluster –… FZJ
13
EUROGRID Technology Based on UNICORE system (currently V3.5) Develop additional GRID components –efficient data transfer –ASP infrastructure –resource broker –application coupling –interactive access
14
Achievements WP1 (Bio-GRID) Jobs built for GROMOS, GAUSSIAN, AMBER Plug-In for Gaussian developed See special presentation and demonstration biogrid.icm.edu.pl Del.TitlePlannedstatus D1.1aBio-GRID Requirements for EUROGRID31-01-01available D1.2a Evaluation of EUROGRID-0, Specification and Requirements for BioGRID 30-04-01available D1.2b First Report on Bio-GRID Operation, Extensions and Adaptations 31-07-01available D1.3aEUROGRID-0.5 Evaluation in Bio-GRID31-10-01available
15
Achievements WP2 (Meteo-GRID) Relocatable version of LM completed Model runs at IDRIS, CSCS, ICM EUROGRID deployment under way Del.TitlePlannedstatus D2.1aMeteo-GRID Requirements for EUROGRID31-01-01 available (update) D2.2a Evaluation of EUROGRID-0, Specification and Requirements for Meteo-GRID 30-04-01available D2.2b First Report on Meteo-GRID Operation, Extensions and Adaptations 31-07-01available D2.3aEUROGRID-0.5 Evaluation in Meteo-GRID31-10-01available
16
Achievements WP3 (CAE-GRID) EADS: Acoustic and electromagnetic applications running with EUROGRID- 0.5 Workflow chain simulation possible Plug-Ins under way T-Systems: evaluation of EUROGRID- 0.5 started, requirements formulated Del.TitlePlannedstatus D3.1aCAE-GRID Requirements for EUROGRID31-01-01available D3.2a Evaluation of EUROGRID-0, Specification and Requirements for CAE-GRID 30-04-01available D3.2b First Report on CAE-GRID Operation, Extensions and Adaptations 31-07-01To be merged with D3.3a D3.3aEUROGRID-0.5 Evaluation in CAE-GRID31-10-01available
17
Achievements WP4 (HPC-GRID) EUROGRID-0.5 installed and running at all centers HPC-GRID operational Evaluation result: EUROGRID-0: good but fragile, EUROGRID-0.5: much progress, more stable Now running coupled applications at multiple sites, see special presentation and demonstration Del.TitlePlannedstatus D4.1aHPC-GRID Requirements for EUROGRID31-01-01available D4.2a Evaluation of EUROGRID-0, Specification and Requirements for HPC-GRID 30-04-01available D4.2b First Report on HPC-GRID Operation, Extensions and Adaptations 31-07-01available D4.3aEUROGRID-0.5 Evaluation in HPC-GRID31-10-01Delayed (Dec 31) FZJ
18
Achievements WP5 (Technology) File transfer infrastructure in place and evaluated Resource broker spec developed and published Interoperability of Unicore with CORBA demonstrated, see special presentation Del.TitlePlannedstatus D5.1aSpec of Efficient Data Transfer Extensions31-03-01available D5.1bEfficient Data Transfer for EUROGRID-0.531-05-01available D5.2aSpec of Resource Broker Extensions31-05-01available D5.3aSpec of ASP Services Extensions31-05-01available D5.4aSpec of Appl Coupling Extensions31-03-01available D5.4bAppl Coupling for EUROGRID-0.531-05-01available D5.5aSpec of Interactive Access Extensions31-03-01available D5.5bInteractive Extensions for EUROGRID-0.531-05-01available
19
Achievements WP6 (Integration) EUROGRID 0 and 0.5 released on schedule and installed at partners Rapid improvement cycle (13 minor releases driven by user requirements), progressive refinement towards EUROGRID 1 Same code base for UNICORE Plus and EUROGRID Interim certification policy available, technology in place EUROGRID has motivated many Unicore developments Technical Project Workshop at Pallas Del.TitlePlannedstatus D6.1aEUROGRID-0 Release Report31-01-01available D6.1bEUROGRID-0 Support Report31-05-01available D6.2aEUROGRID-0.5 Release Report31-07-01available
20
Cooperations UNICORE Plus common code base and exchange of access rights GEANT cooperation regarding QoS requirements DataGRID joint dissemination meetings, joint events GRIDSTART joint dissemination Global Grid Forum participation, contributions, adaptation of standards UK GRID Project UNICORE/EUROGRID workshop planned
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.