Download presentation
Presentation is loading. Please wait.
Published byBernice Harvey Modified over 9 years ago
1
Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute cunha@ipn.pt www.las.ipn.pt Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994
2
What we want to have in May 2011? 14 May 2008www.n4c.eu2
3
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Please: Imagine that we are in 2011 Forget the details... Imagine a unic platform that should fullfil all the requirements 14 May 2008www.n4c.eu3
4
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 To start the integration process we need: 14 May 2008www.n4c.eu4 System Requirements System Specification (Sysml ?) Integration workplan Development and tests + + +
5
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 14 May 2008www.n4c.eu5 Agenda Phase 1 (2 minutes): Sysml overview (idb block) Phase 2 (20 minutes): Identify the system main modules and the communication protocols. – Phase deliverable: N4C global diagram (Sysml) Phase 3 (15 minutes): Identify the main functions and the inputs and outputs of each module – Phase deliverable: “n” Sysml diagrams (one per module), with inputs and outputs (draft) Phase 4 (15 minutes): Identify the expected time for each module development and the dependences between each other – Phase deliverable: Integration workplan Phase 5 (“optional”): Identify the system requirements – Phase deliverable: System requirements list
6
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 1: Sysml overview (idb block) 14 May 2008www.n4c.eu6 Time: 2 minutes
7
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 2: Identify the system main modules and the communication protocols. 14 May 2008www.n4c.eu7 Time: 20 minutes Deliverable: N4C global diagram (Sysml)
8
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 3: Identify the main functions and the inputs and outputs of each module 14 May 2008www.n4c.eu8 Time: 15 minutes Deliverable: “n” Sysml diagrams (one per module), with inputs and outputs
9
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 4: Identify the expected time for each module development and the dependences between each other 14 May 2008www.n4c.eu9 Time: 15 minutes Deliverable: Integration workplan M1M2M3M4M5M6M7M8Mn Module 1 Module 2 Module 3 Module 4 Module n
10
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: 223994 Phase 5 (optional): Identify the system requirements 14 May 2008www.n4c.eu10 Time: -- minutes Deliverable: System requirements Checklist Ref.DescriptionModuleResponsibleVersion R1 R2 R3 R4 Rn
11
N4C speaker: António Cunha Speakers organisation: Pedro Nunes Institute Speakers e-mail address: cunha@ipn.ptcunha@ipn.pt Speakers web page: www.las.ipn.ptwww.las.ipn.pt END/FIM
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.