Kick of WP3 Steps towards building Oxford, first project meeting 23-05-2006 10:30 am – 11:15 am.

Similar presentations


Presentation on theme: "Kick of WP3 Steps towards building Oxford, first project meeting 23-05-2006 10:30 am – 11:15 am."— Presentation transcript:

1 Kick of WP3 Steps towards building Oxford, first project meeting 23-05-2006 10:30 am – 11:15 am

2 Current status WP3 "WP3 is on hold until: the transistion from conceptual framework to implemenation is more clear, and there is a consensus on the architecture. We hope to overcome these issues at the Oxford project meeting."

3 Outline next 40 min..  Definition of work  Contributions of the partners (5 min. Presentations)  Setting up a planning

4 Definition of work

5 Project plan DoW

6 Components of the DoW The principal components are: The attention detection component: Its role is to observe the action of the user, establish current user focus, and update the user model (and in particular attentional state) The agent reasoning component. Its role is to analyze the attentional state of the user, and to construct some possible interventions through the evaluation of possible alternative foci. The agent intervention component. Its role is to select and execute a particular intervention.

7 Outline architecture

8 App Atgentive module User module Living Actor User

9 Steps of WP3

10 Defening the steps  T3.1: Implementation preparation, methodology & plan. Technical approaches are analysed and technical decisions are taken, the development methodology (XP based) is clarified and an implementation plan (for both the components and the e-learning platforms) is elaborated.  T3.2 Implementation of the attention recognition component, the agent reasoning component and the agent intervention component. The different components are developed according to the specifications in WP2. Central to this iterative development process will be the modularity and flexibility of the components.  T3.3: Global integration and technical testing for two pilots. The different components of AtGentive will be integrated in the collaborative e-learning platforms, resulting in first prototypes of AtGentSchool and AtGentNet. Elaboration of the general user’s documentation (integrated as much as possible into the platform).  T3.4: Implementation, setting-up and execution of the validation of the user interaction using eye-tracking. The prototypes will be validated in user tests in which eye-tracking technology will play and important role to asses the functioning of the different components with the AtGentSchool and AtGentNet environment.

11 Steps of WP3

12 Contribution of the partners 5 min presentations

13 Months WP3 PartnerMonths Ontdeknet14 INSEAD16 UTA12 AUP10 Cantoche14

14 Contribution Ontdeknet WP3  Project management + securing the overview  Building specific compontents Ontdeknet  Developing the interface between Atgentive module and Ontdeknet  Implementation of Atgentive

15 UTA

16 Cantoche

17 Insead

18 AUP

19 Setting up a planning

20 Planning milestones WPMilestoneMonthDescription WP1M1.1M04State of the art completed WP1M1.2M06Conceptual Framework first draft done WP2M2.1M07Design of the components completed WP2M2.2M12Design of the learning platforms completed WP3M3.1M12First delivery of components WP3M3.2M16Working prototypes AtGentSchool and AtGentNet WP4M4.1M06Evaluation approach has been defined WP4M4.2M09Formative evaluation has been completed

21 Planning

22


Download ppt "Kick of WP3 Steps towards building Oxford, first project meeting 23-05-2006 10:30 am – 11:15 am."