1 www.urbanvision.org.uk +44 (0) 161 779 4800 Pendleton Subway Improvement 2 nd March 2010 Project Review

2 www.urbanvision.org.uk +44 (0) 161 779 4800 Current Situation. Subways are perceived as uninviting by the public which was confirmed by the students questionnaire; main areas of concern were: - Graffiti Litter Odour Knife Crime Drug Selling Rape

3 www.urbanvision.org.uk +44 (0) 161 779 4800 A feasibility study was undertaken that included: - Review of lighting. Appearance of subway. Surfacing. Improvement to the subway entrance. Consultation with community groups School Project Community Committee Local Councillors

4 www.urbanvision.org.uk +44 (0) 161 779 4800 Potential solutions in consultation with community groups: - Enhanced lighting Enhanced appearance Cleanliness Improve entrance CCTV within subways Improved ‘subway experience’ Options not considered viable: - Revolving advertising boards Stage and projector

5 www.urbanvision.org.uk +44 (0) 161 779 4800 Proposed scheme: - This is to be a trial for future designs throughout the city – obviously colour can be subjective. Brighter lighting at pedestrian level LED blue wash on subway ceiling New brighter tiles to subway walls New surfacing

6 www.urbanvision.org.uk +44 (0) 161 779 4800

7

8

9 Improvement to subway entrances to remove the starkness

10 www.urbanvision.org.uk +44 (0) 161 779 4800 CCTV to monitor inside subway Music

11 www.urbanvision.org.uk +44 (0) 161 779 4800 Summary Where are we up to: - Ideas have been formulated and appear achievable Unique lighting concept that is currently with DesignPlan for development Colour scheme and finishes to be reviewed by community Committee and agreed by Lead Member Final detailed design

12 www.urbanvision.org.uk +44 (0) 161 779 4800 Conclusion With your ideas and those of the Councillors and community we hope that we can complete this design that will be used to test ideas, that if successful will be used in other subways: - 1.Brighter 2.Appearance of being cleaner 3.Safer