Download presentation
Presentation is loading. Please wait.
Published byAriel Lambert Modified over 9 years ago
1
Two Test Level 4 Bridge Railing and Transition Systems For Transverse Timber Deck Bridges by Ronald K. Faller, Ph.D., P.E. Michael A. Ritter, P.E. Barry T. Rosson, Ph.D., P.E. Michael D. Fowler Sheila R. Duwadi, P.E.
2
Introduction Bridge railing research Bridge deck systems - concrete - timber (longitudinal vs. transverse) Need for high performance crashworthy railings FPL, FHWA, & MwRSF
3
Research Objectives Two bridge railings for transverse timber deck bridges - steel - wood High performance railing systems (TL-4) Two approach guardrail transitions Force level determination
4
Bridge Railing History Bridge railing design -10-kip static load method -LRFD method -computer simulation modeling Full-scale crash testing -NCHRP Report 230 -AASHTO Guide Specifications -NCHRP Report 350
5
Test Requirements and Evaluation Criteria NCHRP Report 350 Three required tests - 820C - 100 kph & 20 deg - 2000P - 100 kph & 25 deg - 8000S - 80 kph & 15 deg Structural adequacy, occupant risk, & vehicle trajectory after collision
6
Wood Bridge RailSteel Bridge Rail
7
Conclusions Two bridge railings for transverse timber deck bridges Wood and steel rail options Two approach guardrail transitions Crash tests met the TL-4 evaluation criteria Modifications based on load data
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.