Download presentation
Presentation is loading. Please wait.
Published byJeffery Glenn Modified over 9 years ago
1
CONVERGENCE PROCESS PRESNTATION BY: 445, Phase III, Udyog Vihar, Gurgaon
2
THIS ACT CAME INTO FORCE FROM SEPTEMBER, 2005 IN 1 ST STAGE ONLY DISTRICT HOSHIARPUR WAS SELECTED AND SUBSEQUENTLY MNREGA BEING IMPLEMENTED IN ALL DISTRICTS IN PUNJAB GOVERNMENT LEGALLY ACCOUNTABLE FOR PROVIDING EMPLYMENT ON DEMAND MNREGA PLANNING IS DECENTRALIZED AND FUNDS ARE UNTIED WORKS PLANNED AS PER LOCAL SPECIFIC NEEDS 50% OF MNREGA WORKS RELATE TO WATER CONSERVATION/WATERSHED DEVELOPMENT
3
THE BASIC OBJECTIVE: TO PROVIDE AT LEAST 100 DAYS OF GUARANTEED WAGE EMPLOYMENT TO UNSKILLED LABOUR ENHANCE LIVELIHOOD SECURITY IN RURAL AREAS GENERATING PRODUCTIVE ASSETS PROTECTING ENVIRONMENT EMPOWERING RURAL WOMEN REDUCING MIGRATION
4
STRENGHTENING DEMOCRATIC PROCESS ENABLING SUSTAINABLE DEVELOPMENT TO FURTHER ENHANCE THE BENEFITS OF MNREGA ENHANCING ECONOMIC OPPORTUNITIES
5
GUIDELINES FOR MNREGA TO BE FOLLOWED GRAM PANCHYATS TO BE CONSULTED AND WORKS IDENTIFIED WITH THEIR CONSENT IN WRITING GRAM PANCHAYTS: FOCAL POINT FOR IMPLEMENTATION
6
SELECTION OF WORKS AS PERMISSIBLE UNDER MNREGA – REF.GUIDELINES MNREGA WORKS TO BE SELECTED VERY CAREFULLY SO AS TO ACHIVE LONG TERM SUSTAINABILITY
7
CONVERGENCE WITH IWMP FEW ACTIVITIES SUCH AS: PLANTATION, DESILTING OF CHECK DAMS, PONDS BE TAKEN UP WORK TO BE DONE BY LANDLESS PEOPLE AND SELF HELP GROUP MEMBERS.
8
CONSTRCUTION OF CHECK DAMS DEEPENING AND DESILTING OF PONDS EXTENSION AND RENOVATION OF EXISTING IRRIGATION PROJECTS FLOOD PROTECTION WORKS LIFT IRRIGATION WORKS CONSTRUCTION OF NEW DRAINS AND RENOVATION OF EXISTING DRAINS REMOVAL OF VEGETATION GROWTH
9
UNDER MNREGA ALL ACTIVITES REQUIRED FOR WATERSHED DEVELOPMENT PERMITTED CONVERGENCE BENEFICAL FOR RAIN FED AREAS
10
MNREGS GUIDELINES TO BE FOLLOWED COST PER Ha RS.12000/- NOT ADEQUATE? ADDITIONAL COST TO BE MET FROM MNREGA? LABOUR:MATERIAL COST i.e 60:40 RATIO TO BE MAINTAINED WORKS BE DONE BY MANUAL LABOUR- MACHINES TO BE AVOIDED CONTRACTOR SERVICE NOT ALLOWED CONVERGENCE ACTIVITIES TO BE IDENTIFIED BY PIA
11
MNREGA AND IWMP CONVERGENCE REQUIRES COORDINATION AT: MANAGEMENT PLANNING WORKS
12
ENSURING THAT THE WORKS IDENTIFIED IN THE DPR WOULD BE AS PER PROCEDURE LAID DOWN IN COMMON GUIDELINES 2008 FOR MNREGA AND IWMP GUIDELINES APPROVAL IN SUCH CASES TO BE OBTAINED FROM DISTRICT PROGRAM COORDINATOR, MNREGA TO ENSURE CONVERGENCE DISTRICT RESOURCE GROUP TO BE CREATED – TO BE REPRESENTED BY WATERSHED CELL AT DISTRICT LEVEL, PIA AND RD
13
KNOWLEDGE SHARING: Familiarization of both programs PLANNING: As per common guidelines COMMUNICATION: Participatory processes TRAINING: To stakeholders TECHNICAL SUPPORT: Selection of works MONITORING AND EVALUATION: JOINT MONITORING
14
GUIDELINES OF MNREGA: STIPULATES FORMULATION OF PERSPECTIVE PLAN TO FACILITATE ADVANCE PLANNING AIM OF PERSPECTIVE PLAN: AIMS TO IDENTIFY THE TYPE OF WORKS THAT SHOULD BE ENCOURAGED AND POTENTIAL LINKAGES BETWEEN THESE WORKS AND LONG TERM EMPLOYMENT GENERATION AND SUSTAINED DEVELOPMENT
15
DPR FOR IWMP TO INCLUDE YEAR WISE ACTION PLAN FOR MNREGA WORKS SIMILARLY MNREGS ALSO TO INCLUDE YEAR WISE SHELF OF WORKS TO BE TAKEN UP BY PIA
16
AREAS WHERE NEW WATERSHEDS ARE PROPOSED: ADDITIONAL WORKS: PROPOSED ACTIVITES AS PER GUIDELINES OF MNREGA AND IWMP EXECUTION AS PER ABOVE GUIDELINES MAINTAINING LABOUR:MTERIAL AT 60:40 RATIO COST NORMS TO BE MAINTAINED AS PER COMMON GUIDELINES. EXECUTION: AS PER MNREGA GUIDELINES
17
ONLY JOB CARD HOLDERS TO BE PROVIDED EMPLOYMENT FOR MNREGA WORKS MUSTER ROLLS TO BE MAINTAINED ON WORK SITE, WITH COPIES IN THE GRAM PANCHAYAT AND TO BE ELECTRONICALLY MAINTAINED ON MNREGA WEBSITE: nrega.nic.in SOCIAL AUDITS TO BE DONE BY GRAM SABHAS WAGES TO LABOUR THROUGH BANKS/POST OFFICES
18
THANK YOU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.