Presentation is loading. Please wait.

Presentation is loading. Please wait.

AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne, 19.03.2014.

Similar presentations


Presentation on theme: "AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne, 19.03.2014."— Presentation transcript:

1 AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne, 19.03.2014

2 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 2 Outline AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and Cooling 5.Absorber Structure validation (earth quake)

3 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 3 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

4 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 4 AHCAL Mechanics Mechanics for test beam setupschedule 29 Weeks from now dismount and install ?

5 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 5 AHCAL Mechanics Mechanics for test beam setupT9 floor plan AHCAL test beam setup

6 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 6 AHCAL Mechanics Mechanics for test beam setup Movable Stage with 2 x absorber stack Air stack 2 x absorber stack stand alone Movable stage with 1 x absorber stack Tungsten absorber stack

7 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 7 AHCAL Mechanics Mechanics for test beam setupLayer configuration Layer 31 (4xHBU) Layer 21 (4xHBU) Layer 3-10 (1xHBU) Layer 1-2 (1xEBU)

8 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 8 AHCAL Mechanics Mechanics for test beam setup1xEBU configuration EBU CIB Extender card type 1 Extender card type 2

9 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 9 AHCAL Mechanics Mechanics for test beam setup1xHBU configuration HBU Extender card type 1 Extender card type 2 CIB

10 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 10 AHCAL Mechanics Mechanics for test beam setup4xHBU configuration CIB SIB HBU Extender card type 1

11 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 11 Task list (Summary):  test beam schedule fixed!!!  Movable Stage not used !stand by  EUDET absorber structureready  Tungsten absorber structure ready  air stack needed? ?  delivery of 50 pc. 2xHBU-extended-CIB housingsKW19  delivery of 50 pc. 2xHBU-extended-SIB housingsKW19  mounting of 14 fully equipped housings to EUDET absorber stackKW28 to KW29  install supply and read out hardware KW28 to KW29  commission and test KW30 to KW34  mounting of 14 fully equipped housings to Tungsten absorber stack framesKW34  commission and test (in air stack?) KW35 to KW38  pack test beam setup equipmentKW39  transport from DESY to CERNKW40  T9 Phase1KW43 to 45 2014 position inside the T9 allows parasitic measurements or reinstallation? KW45 to 48 2014 T9 Phase2KW48 to 50 2014 AHCAL Mechanics Mechanics for test beam setup

12 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 12 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

13 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 13 AHCAL Mechanics EUDET test beam setup Layer 21 (4xHBU) Layer 3-10 (1xHBU) Layer 1-2 (1xEBU) Layer 31 (4xHBU)

14 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 14 AHCAL Mechanics EUDET test beam setup Layer 1 and 2 Support plate

15 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 15 AHCAL Mechanics EUDET test beam setupLayer 3 to 10 Support plate

16 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 16 AHCAL Mechanics EUDET test beam setupLayer 21 and 31

17 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 17 Task list (Summary): > Test beam setup  test beam Phase1 or Phase2?  position inside T9?  installation design for self standing absorber structure done  supply, read out and cooling schemedone > Detector layer production  production of housingsongoing  production of 16 equipped HBU?  production of extender cards?  production of support platesongoing Detailed Schedule as to be worked out during this Meeting! AHCAL Mechanics EUDET test beam setup

18 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 18 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

19 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 19 AHCAL Mechanics Tungsten test beam setup Layer 21 (4xHBU) Layer 3-10 (1xHBU) Layer 1-2 (1xEBU) Layer 31 (4xHBU)

20 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 20 AHCAL Mechanics Tungsten test beam setup aluminum frame with 2 x 1 mm FR4 cover to center the housing tungsten area Al frame parts produced at MPI

21 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 21 AHCAL Mechanics Tungsten test beam setup Layer 1 and 2 housing with 1xEBU CIB

22 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 22 AHCAL Mechanics Tungsten test beam setup Layer 3 and 10 housing with 1xHBU CIB

23 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 23 AHCAL Mechanics Tungsten test beam setup Layer 21 and 31 housing with 2xHBU SIB CIB

24 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 24 AHCAL Mechanics Tungsten test beam setup 50 frames frame with housings closed housings removed cover plate

25 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 25 AHCAL Mechanics Tungsten test beam setup 40 tungsten absorber plates are installed

26 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 26 AHCAL Mechanics Tungsten test beam setup Modification of the tungsten absorber structure ?

27 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 27 Task list (Summary): > Test beam setup  test beam Phase1 or Phase2?  position inside T9?  modify tungsten absorber structure ?  installation design for self standing absorber structure done  supply, read out and cooling schemedone > Detector layer production  production of housingsongoing  production of 16 equipped HBU?  production of extender cards?  production of support framesdone  production of inner support platesongoing Detailed Schedule as to be worked out during this Meeting! AHCAL Mechanics Tungsten test beam setup

28 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 28 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

29 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 29 AHCAL Mechanics Cabling and Cooling setup power distribution Power cabling for 1 x submodul LDA

30 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 30 AHCAL Mechanics Status Report 1.Mechanics for test beam setups 2.EUDET test beam setup 3.Tungsten test beam setup 4.Cabling and cooling 5.Absorber structure validation (earth quake)

31 Karsten Gadow | CALICE Collaboration Meeting | 19.03.2014 | Page 31 Simulation for AHCAL barrel structure will be done in summer 2014 by DESY-ZM1 ILD workshop, Cracow, 24-26 September 2013 AHCAL Mechanics Absorber structure validation (earth quake)


Download ppt "AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne, 19.03.2014."

Similar presentations


Ads by Google