Background Design Started in 1949 Completed in October 1954 1955: 100 Year Flood Collapsed in 1987
4
The Bridge Standard Highway Bridge 165 Meters Long 5 Simple Supported Spans 2 Columns
5
The Collapse 5 th of April 1987 Spring Flood Pier 3 Pier 2 Pier 1
6
The Collapse Collapse of Span 2
7
Causes of Collapse Extensive Scour Shallow Foundations Blue Prints Under Reinforced Roadway
8
Lessons Learnt Importance of Footing Depth Under Water Inspections River Flow Design For Rare Events