1 KGHM Polska Miedź S.A. The biggest producer of copper and silver in Europe Copper 486.002 t Silver 1100 t Gold 386 kg
3
2
4
3 CBPM CUPRUM The general designer and researcher of LGOM copper basin
5
4 TECHNOLOGICAL CHAIN Mining Processing Waste disposal
6
SALES VOLUME Total4,928 mln zł Copper3,983 mln zł Silver772 mln zł
7
6 Owner structure of KGHM Polska Miedź S.A. (as at 12 January 2001)
8
7 2000 Copper Sales - Markets
9
8 Industrial resources 781.087 mln tonnes of ore depth up to 1250 m average content Cu 2,12 % average content Ag 56 g/t Anticipated exploitation period 20-25 years with current production volumes Copper Resources
10
9 Lena no 141 ha7 mln t Lena no 288 ha15 mln t Konrad no 1129 ha18 mln t Konrad no 212 ha1,2 mln t Konrad no 3145 ha16,6 mln t Gilów600 ha92,0 mln t Żelazny Most1260 ha525 mln t Tailings ponds
11
Localisation of tailings ponds
12
11 „Żelazny Most” tailings pond
13
12 TAILINGS PONDS ENVIRONMENTAL PROBLEMS Huge scale of the pond Dusting Contamination of surface and underground water with salt and heavy metals in the local drainage basin Increasing heavy metal contents in soil and plants surrounding the tailing plant Contamination of Odra river by technological water
14
13 LICYMIN LIFE CYCLE ASSESSMENT OF MINING PROJECTS FOR WASTE MINIMISATION AND LONG TERM CONTROL OF REHABILITATED SITES KGHM PM S.A. CBPM CUPRUM G1RD-CT-2000-00162
15
14 Life cycle assessment of mining projects for waste minimisation and long term control of rehabilitated sites The main objective of this project is to develop and validate a metodology to minimise the „full life-cycle” impact of metalliferous mining projects, adopting an integrated approach to production and process design, including waste disposal, remediation and the costs involved GENERAL TARGET
16
15 POLISH PARTICIPANTS KGHM Polish Copper S.A. /CBPM CUPRUM Polish Academy of Science, Kraków
17
16 Frame Scope of Work Updating of the existing database Conceptual LCA modelling of the production and processing and financial modelling of these options Mining and processing alternatives will aim at developing methodologies to improve recovery, minimise waste production and ensure safe, low risk disposal Environmental monitoring and long term control of the impacts of the mining activities
18
START MARCH 2000
19
18 CLOTADAM Chemically Stabilised Layers KGHM PM S.A. CBPM CUPRUM G1RD-CT-2001-00480
20
19 Chemically Stabilised Layers Through forming chemically stabilised layers with properly selected lifi- time to help in faster, more effective and more environment- friendly closing tailings pond GENERAL TARGET
21
20 PARTICIPANTS KGHM Polish Copper S.A. /CBPM CUPRUM o Environmental Protection Dpt. o Environemntal Protection Management Dpt. o Tailing Ponds Dpt. Polish Academy of Science, Kraków
22
21 Frame Scope of Work Updating of the existing database Preliminary selection of chemicals and additives Elaboration of agents and methods for their application, including local additives Laboratory research on application conditions and effectiveness of selected agents Pilot tests Technical-economic assesment Elaboration technology for industrial application
23
START SEPTEMBER 2001