Mu2e Meeting, April 2, 2008 E Prebys Toward a Proposal Key Points In order to start money flowing, we need to pursue CD-0 (“Statement of Mission Need”) as quickly as possible Whether or not protons come from Project X is a detail as far as this is concerned. Propose Proceed as fast as possible with our original plan for a “Phase I” experiment Magnet and spectrometer more or less identical to MECO Protons provided by existing Proton Source via the Accumulator Debuncher Include boiler plate about possible Project X upgrades Hand in by Fall? Further resolve That this be the last talk about “What we’re going to do”. 1
2
Mu2e Meeting, April 2, 2008 E Prebys To Do List Develop and use our own modeling tools to reproduce the studies that were done for MECO Beam line with G4 beamline Mike Martens Spectrometer with Geant4 Bob Bernstein Obtain mechanical drawings for solenoidal transport system, with the plan of presenting it as is in the proposal ??? 2
3
Mu2e Meeting, April 2, 2008 E Prebys To Do (cont’d) Flesh out accelerator issues Beam stability in Accumulator and Debuncher Chuck Angenbrandt (+ Dave Neuffer, with help from Bill Ng) Details of slow extraction Me, with help from, eg, John Johnstone Radiation issues Enlist Tony Leveling Beam line design, including extinction system TBD Civil Location Can we do it at AP-0? –Milorad, et al Cost $100 K to FESS 3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.