2010 ROADWAY CONFERENCE 1R PROGRAM Steven Lindland
2
1R Technical Bulletin
3
1R Program u Pave Mainly –Single Lift Non-structural Inlays, Single Lift Non-structural Overlays, Inlays & Overlays with a Design Exception. Can’t Make Any Safety Features Worse. u Statewide Strategic Approach to Highway Features Normally Upgraded by 3R Projects u $6 M 1R Safety Fund for Traffic Barrier Upgrades u Roadside Inventories Essential to Maintain Data in Asset Inventories for Strategic Planning.
4
1R Program – What’s New? Cathy Nelson’s November 24, 2009 Memo u Approval of 1R Projects: Region Roadway, Pavement Services and FHWA u Tracking of 1R Projects - Roadway Engineering u Roadside Inventories – using FACS-STIP Tool u 1R Project shall only address paving and impacted features – unless other funds used u E&C limited to 20 percent
5
1R Program – What’s New? Steve Lindland’s December 10, 2009 Memo u 12 ARRA Projects Needing Roadside Inventories u Roadside Inventory - Feature List and Data List u FACS-STIP Tool for Roadside Inventories u Send Completed Inventories to Laura Wipper, AMI Manager and Steve Lindland, Roadway u Inventory Completion Date for ARRA - June
6
1R Program – What’s New? u Majority of Project – 75 percent u Structural Overlays - up to 25 percent. Need to address ADA Ramps at Intersections affected. u Concrete Pads at Intersections - Need to address ADA Ramps at Intersections affected. u Paving Approaches – no u Bridge Rail Inventory Completed - $380 M for Substandard and $50 M for High Priority Rails u Bridge Rails – probably $1 million per year u 1R Projects added to PS&E Checklist
7
1R Projects To Date 12 ARRA Projects 5 STIP Projects 27 ARRA 2 Projects
8
Questions