Download presentation
Presentation is loading. Please wait.
Published byMadison Watson Modified over 9 years ago
1
MDOT CORS & M.H.M.P Andy Semenchuk, P.S. MSRN ADMINISTRATOR
2
ref er ence, n.,- 1. referred or consulted as a centering point base, n.,- 1. the fundamental part or foundation sta tion, n.,- 1. a place or position where something is to remain 2. a place equipped for some particular kind of work, service, or broadcasting Defined by “Webster” What is a Reference/ Base Station
3
Building the Monuments We researched and consulted with Structural and mechanical engineers to try and build stable monuments for the conditions we encounter in Michigan. We decided and a 2 part mount. The base consisting of a reinforced concrete monument 24” in diameter by 12 feet below grade. And the mast which is know commonly known as an “Earlconic”.
5
SITE PHOTOS Looking in the monument hole. Waiting for the concrete. Cable Trench
6
Site Selection. The first 12 sites we had planned were selected on the following criteria. Must be on MDOT property Must have had an existing dedicated LAN connection. Must have met visibility requirements and suitable soils for stability.
7
Phase Description Phase I (Real-Time Data Acquisition and Integrity Monitoring) Deploy network of Static Stations Operational Testing Public Access (User training/ Workshops/Seminars MDOT Expansion County Expansion City Expansion Emergency/ Utilitarian expansion Phase II (Real-Time Broadcasting) In Planning Real-time PCS Policy for City/ County additions to network Phase III The future
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.