RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.

Similar presentations


Presentation on theme: "RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS."— Presentation transcript:

1 RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS REPORT OF THE CURRENT TESTS RUDE Vivien

2 DRIVE BEAM DRIVE BEAM MAIN BEAM MAIN BEAM Presentation of the mock up RUDE Vivien

3 Test Module Synoptic RUDE Vivien B4-C B4-PT B4-T VLA010 VLA011 VLA010

4 Objectives :  Validation of alignment Systems  Qualification of linear actuators  Qualification of articulation point  Conclusion  Perspective Objectives RUDE Vivien

5 Time series of the tilt ( Inclinometer ) June 11, 2011 : June 11, 2011 :  23,5 °C  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

6 Time series of the tilt ( Inclinometer ) September 15, 2011 : September 15, 2011 :  25,5 °C  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

7  = 2,1  rad PAM-T Repeatibility test concerning inclinometer  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

8 Time series of the Transversal Position ( WPS) June 11, 2011 : June 11, 2011 :  23,5 °C  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

9 Time series of the Transversal Position ( WPS) September 15, 2011 : September 15, 2011 :  25,5 °C  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

10 Repeatibility test concerning WPS sensors B3-C PAB-C  = 0,4  m  = 0,3  m  = 0,5  m  = 0,3  m Control of wire stability PBB-C  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Control of wire stability

11 Displacement of straight wire  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

12 Displacement of straight wire Difference with theoretical Value  B4-C : 0.2 micron  B2-C : 0.2 micron  B3-C : 1.4 micron  B1-C : -1 micron  B5-C : -1.5 micron Difference with theoretical Value  B4-C : -1.9 micron  B2-C : -13.4 microns  B3-C : 2.7 microns  B1-C : 26.8 microns  B5-C : 22.8 microns  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

13 Test Actuators : Limit of Vertical Actuators Boostec LIMIT / VERTICAL / BOOSTEC: LIMIT / VERTICAL / BOOSTEC:  Moving the 6 Vertical actuators  In the same time  UP and DOWN + / - 3 mm  Step : 100 microns  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

14 Test Actuators : Limit of Vertical Actuators Boostec  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

15 Test Actuators : Limit of Vertical Actuators Boostec  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

16 Test Actuators : Limit of Vertical Actuators Boostec 2 Solutions : 2 Solutions :  Increase the length of the last girder  Increase the longitudinal space between the two plates of the articulation point  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective

17 Test Actuators : Classic Case  Vertical : + / - 1 mm  Horizontal : + / - 1 mm  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective  = 99  m  = 98  m  = 101  m  = 131  m  = 98  m  = 93  m  = 95  m  = 120  m

18 Test Actuators : Classic Case  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective  Vertical : + / - 0.9 mm  Horizontal : + / - 0.9 mm  = 106  m  = 105  m  = 111  m  = 112  m  = 114  m  = 112  m  = 111  m

19 Test Actuators : Backlash for Boostec  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Boostec OrderUPDOWN Backlash (  m) 55-50 109-90 2019-190 2524-25 4039-390 5049-490 7068-69 8584-840 10099-990 150148-149 350348-3471 500497-4961 800796-7960 Micro-Contrôle OrderUPDOWN Backlash (  m) 56-60 1011-110 2021-210 25 -250 4041-42 5052-520 7073-721 8590-92-2 100108-1071 150160-1600 350384-3840 500553-5530 800887-8861

20  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective RESOLUTION :  BOOSTEC VERTICAL : 0.17 micron  BOOSTEC HORIZONTAL : 0.2 micron  MICRO-CONTROLE VERTICAL : less than 0.2 micron  MICRO-CONTROLE HORIZONTAL : less than 0.2 micron Test Actuators : Resolution

21  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Articulation-Point : Vertical translation

22  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Articulation-Point : Vertical translation

23  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Articulation-Point : Rotation

24  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Conclusion concerning Validation of alignment systems:  Inclinometer :  Good repeatability Problem : need 1 hour after installation to be stabilized Problem : increase of the noise in 3 months  WPS :  Good repeatability  Good precision (Same wire in the mock up and for the calibration)  Problem : increase of the noise in 3 months Conclusion (1/3)

25  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Conclusions concerning Boostec Actuators:  Vertical Actuators :  Very Good resolution  Very Good repeatability  Good backlash Problem : de-synchronisation after 3 hours  Transversal Actuators:  No de-synchronisation  Good backlash Problem : one transversal actuator is not linear and has a bad repeatability (std=14 microns) Conclusion (2/3)

26  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Conclusions concerning Micro-Controle Actuators:  Vertical Actuators :  Good backlash  Good repeatability Problem : need to readjust the step  Transversal Actuators:  Good backlash  Good repeatability Problem : need to readjust the step Conclusion (2/3)

27  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Conclusions concerning Articulation Point :  Boostec:  Good transfer of the translation  Good transfer of the rotation Problem : need to resolve the problem of the last girder (too short) Problem : shift of 120 microns for the vertical distance between the two girder  Micro-controle:  Good transfer of the translation  Good transfer of the rotation Problem : shift of 50 microns for the radial distance between the two girder Conclusion (3/3)

28  Validation of alignment systems  Inclinometer  WPS  Test - Actuators  Limit  Classic Case  Backlash  Resolution  Articulation- Point  Translation  Rotation  Conclusion  Perspective Perspective :  Inclinometer and WPS:  Improve the absolute measurement (only relative for now)  Understand the increase of the noise  Girder:  Find a solution for the last girder  Actuators :  Adjust the step of Micro-Controle actuators  Increase the range of Micro-Controle actuators (only 1 mm for now)  Resolve the problem of the de-synchronisation of Boostec actuators after 3 h  Articulation Point :  Resolve the problem of the shift for Boostec and for Micro-Controle  Me (Vivien RUDE):  Improve my English Perspective


Download ppt "RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS."