Presentation is loading. Please wait.

Presentation is loading. Please wait.

Donghee Kim Samsung Electronics +82-31-279-5089 ABSTRACT: This contribution shows the summary of changes in evaluation methodology text.

Similar presentations


Presentation on theme: "Donghee Kim Samsung Electronics +82-31-279-5089 ABSTRACT: This contribution shows the summary of changes in evaluation methodology text."— Presentation transcript:

1 Donghee Kim Samsung Electronics +82-31-279-5089 zkim@samsung.com ABSTRACT: This contribution shows the summary of changes in evaluation methodology text. TITLE: Summary of Changes in Evaluation Methodology TSG-C WG3 RECOMMENDATION: Review and Discussion Samsung Electronics grant a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. Samsung Electronics are also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution. This document has been prepared by Samsung Electronics to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Samsung Electronics. Lucent, Nortel and Samsung specifically reserves the right to amend or modify the material contained herein and to any intellectual property of Samsung Electronics other than provided in the copyright statement above. C30-20080512-16 DATE: May 12, 2008 SOURCE:

2 Items Updated in V8  ‘Forward’ is added (pdf page 15) document history about Revision 0 and A is described  Scheduler for calibration is updated based on agreed scheduler C30- 20080331-030R1 (pdf page 54~58, 82~86) In section 2.4.2.1.1 and 3.4.2.3.1  Wording regarding requirement of proponent for calibration is modified (pdf page 53, 80) Shall  should

3 Update History (1/4)  V1.1 - C30-20050718-024 Samsung cdma2000 Evaluation Methodology V1.1.zip BCMCS evaluation methodology is merged - 3GPP2, 1xEV-DO BCMCS Evaluation Methodology Document, Contribution C30-20040920-015R3, Sept. 2004 13dB of Max C/I is changed to 13.5dB according to BCMCS methodology. 17dB of Max C/I is added for OFDM transmission and demodulation. Multipath model for OFDM Transmission and Demodulation Symbol SNR Modeling for CDM transmission with Rake demodulation is described in Appendix S. Equivalent SNR Approach for OFDM Transmission and Demodulation is described in Appendix T. New sub-section ‘2.3.3 Simulation Flow for the Wrap Around Method’ is added.

4 Update History (2/4)  V2 - C30-20060626-046A_Evaluation_methodology_text_V2.zip Layout files Traffic models for VoIP and VT Fairness Criterion with Geometric Mean and Harmonic Mean IoT Criterion Number of users for full buffer and mixed traffic  V3 - C30-20060719-003A_Evaluation_methodology_text_V3.zip Channels model based on SCM Channel parameters for fudge factor In Appendix V

5 Update History (3/4)  V4 - C30-20060823-004A Evaluation methodology text V4.pdf Site to site distance of 2.0 km and Max C/I of 18.1 dB Comments on Equivalent SNR Method based on Convex Metric (ECM) FL VoIP delay jitter model C30-20060719-006_Samsung_FL_VoIP_packet_delay_jitter_model.pdf Link statistics for link to system mapping in Appendix W C30-20060731-021-LU-LinkStatisticsText.pdf  V5 - C30-20060911-061A-Evaluation methodology text V5 Comments for Max C/I of 18.1 dB in Table 2.1.2-1 is added (pdf page 33) Reference for the source file with FL VoIP delay jitter model is added (pdf page 131) VoIP delay criterion is added (pdf page 131) Based on e-mail distribution from chair

6 Update History (4/4)  V6 - C30-20061204-062A-Evaluation methodology text V6 Correct the discrepancy in pathloss between SCM and FL/RL system paratermers previously used Change from ‘34.5 + 35log10(d) dB’ to ‘28.6+ 35log10(d) dB’ in Table of Macro- cellular Environment Parameters, Section 2.2.2.2.1  V7 - C30-20080331-037AR1-Evaluation methodology text V7 Terminology changed through the text (pdf page 15 and others) ‘phase 2 system’  ‘UMB system’ Max C/I of 28dB added on table 2.1.2-1 (pdf page20) Section ‘2.4 Calibration requirement ‘in the forward link and ‘3.4.2.3 UMB system calibration’ in the reverse link are created. (pdf page 53 and 80) Description based on the approved contributions up to February meeting. It needs to be updated as calibration goes on.


Download ppt "Donghee Kim Samsung Electronics +82-31-279-5089 ABSTRACT: This contribution shows the summary of changes in evaluation methodology text."

Similar presentations


Ads by Google