ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.

Similar presentations


Presentation on theme: "ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN."— Presentation transcript:

1 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN

2 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL PP1b integrated with Panels Panel design motivated to increase space internal to the ID Endplate Panel Layout divided to fit integration with Service Panels— corrugated panels integrated with corresponding service panel Panel lengths/widths sized to pack well into R450, and to fit through PST for installation Design required accurate connector count… R450

3 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Connectivity Tables Module to PP0 –Developed table which maps each single module to unique connector on PP0 –Followed naming conventions developed in Service Doc, invented new where necessary –Includes calculation of Length of Type 0 cable PP0 to PP1b (through PP1 Penetration Flex) –Table maps each PP0 Flex (Half-Stave/Sector) to a unique set of function-specific connectors at PP1b –Includes routing through PP1 flex –Logically splits at PP1 flex to map to Type2 cables defined in Service document –Invented PP1b Corrugated Panels—includes mapping to positions on panels Tables Split into Inner and Outer Service Panels (Side A&C for PP1b) –Decided to move ‘third hit’ to Inner Service Panel to allow for easier staging of detector Services –Disks 1&3 and Layers 0(B-layer) & 2 are on the Outer Service Panel –Disk 2 and Layer 1 are on the inner Service Panel Propose to Freeze this routing pending –Verify independently/include some auxiliary information

4 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Data Sources Used to Develop Tables Module Positions –Drawings, Layout Document Service Document –Naming Schemes –Numerology –Cable Definitions Models of Service Panels –Invented Naming convention for Service Panel Components— following Service Document –Positions of PP0 Connectors –Panel Corrugations PP1 Penetration Flex –Invented Naming Convention –Followed ‘Design Rules’ based on Maurice’s Concept LEMO Connectors –Baselined Mauro’s choice of LEMO Connector –Solid Models from LEMO PP1 Corrugated Panels –Invented Corrugated Panels to hold Lemo connectors –Populated Panels with connectors with correct ‘count’ of connectors

5 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Numerology and Naming Convention Overview Naming convention of elements tied to geometry –Where possible, this is tied to the ‘Absolute’ ATLAS scheme (clockwise on side C –Where articles are identical, or mirror symmetric, this is sometimes broken –All names are unique when concatenated Some Conventions are new—invented to cover items designed since the writing of the service document –These items follow the above rules –Some items (of higher importance) I have left un-named, but left space in tables to discuss naming conventions here Includes unique ID of Cables/Connectors May want to include ProdDB reference May want to use Connectivity Tables to formulate Relational Connectivity Database

6 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Panel Numerology LEFTRIGHT

7 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL PP1b Numerology LEFTRIGHT Looking *AWAY* from IP ISP OSP 5432154321 5432154321 1 2 3 3 2 1 1 2 3 4 4 3 2 1 Row Octant Designation

8 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL 6+7 HIGH VoltagePOWER NTC OPTO NTC OPTO HIGH Voltage NTC OPTO POWER 2A, 2B, 2C 4 X 2E1 4 X 2E2 Outer Panel PP1 Flex Penetration 1 2345678 9101112131415 141312111098 7654 32 1 OPPF-(1-15)-R/L L(eft) R(ight) L(eft) R(ight) L(eft) R(ight)

9 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL NTC OPTO NTC ENV 6 7 6 7 6 7 HVPower HV NTC OPTO Power Humidity Sensor Inner Panel PP1 Flex Penetration Cooling Tubes 2A, 2B, 2C 4 X 2E2 Cooling/Env 4 X 2E2 4 X 2E1 2 X 2E1 Min Length, +4 flex designs IPPF-(1-8)-R/L 4 32 123456781 5678 L(eft) R(ight) L(eft) R(ight)

10 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL PP1b Outer Service Panel Locator Connectors identified by indicial position [Row;Position] –Row Numbered from low to hi Z –Position numbered from Flex toward center of SQP Numbers on connectors are PP1 Flex designations –Most flexes share connectors, most are designated L/R which is defined in the ‘assembly’ coordinates… Note—OSP has 21 connectors, One must be supported by the PP1b-ISP neighboring IP Viewed Toward IP

11 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL PP1b Inner Service Panel Locator Connector From OSP is always the same—NTC/OPTO from flex #7 In event of 2-hit system—this connector must be supported another way Also—Inner Panel Penetration Flex is still required but limited to Environmental/Cooling Sensor Wires IP Viewed Toward IP

12 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Quarter Panel Connectivity One Quadrant (SQP C78) Shown for OUTER SERVICE PANEL

13 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Detail Blue Boxes are Connecto rs ‘X’ indicates which flex is serviced by the connector—a missing ‘X’ indicates an ‘empty’ flex or ‘spare’ PP1 FlexPP1b ConnectorPP0 infoService Panel EMPTY PP0 Flex (in Red) ‘Empty’ flexes are still wired, just no stave or sector are attached to them

14 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Module to PP0—Module Information No M0 on Sector s Disk Designat or

15 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Module to PP0—PP0 Connector information Connector-Numbers 0-6 on PP0 indicated. Numbers under Connector-Number are the module designator for the indicated local support and Type 0 cable length Lengths to be grouped to minimize # of styles to produce—TBD

16 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Type0 Cable Lengths Routing Information Buried in Spreadsheet Used Various Drawings to extract geometry information—need to check that all is most current Length check by Andreas gets within few mm, but need to make consistent After this check, freeze Cable Lengths

17 ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Conclusions Work near complete, would like to freeze without further optimization—only verification Work to be verified –Lengths of Cables –Cross-check against all cable types –Naming verification (convention)—should do prior to release for approval Work to be done—still quite a lot –Tube connectivity –Opto connectivity Increase Granularity of Mapping –Pin-outs for connectors—can be done independently –Map tube-connectivity/naming and respective temp sensors to pin-out level –Include ‘Environmental’ sensors in detail Design/Prototyping –Build ¼ PP1b segment using real connectors, and production methods –Thermal environment modelling—understand internal gas temp, opto-cooling, cable-cooling—need to understand what to do with auxilliary cooling circuits…