Presentation is loading. Please wait.

Presentation is loading. Please wait.

DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado 80401 303-273-3592 Critical.

Similar presentations


Presentation on theme: "DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado 80401 303-273-3592 Critical."— Presentation transcript:

1

2 DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado 80401 303-273-3592 rknecht@mines.edu Critical Design Review April 2, 2004

3 CSM Mission  Landing site imaging  DescentSat Video mechanism  TXSat Radio transmission mechanism  LandSat Up-right mechanism  RoverSat Rover mechanism Video mechanism

4 Project Goals  to gather visual images and pictures as the satellite approaches the landing site.  to initiate research supporting future missions to the lunar surface.  to explore the design issues and imagery necessary to select a landing site.

5 Project Demographics SpecificationValue Project Students15 Teams3 System Weight1.5kg Cost$1,500.00 Tether2.5mm Launch August 7

6 Potential Sats DescentSat LandSat RoverSat Landing Site Satellites The purpose of the Landing Site Sats is to gather data and information support the selection of a landing site on other moons or planets.

7 Storage Transmission Location Impact Visual Images Orientation & Mobility Power data conditions energy General Subsystem Diagram Landing Site Sat

8 Subsystem Examples  Video camera  Radio transmission  Orientation mechanism  Ramp deployment  Rover  Remote controller  BrainStem controller  Power supply

9 Up Down Crash

10 TEAM U. D. C. - JACOB KIRKLEY - DAN ALLEN - NATHAN SKITT - ZAC SELF

11 Satellite Subsystems MOTOR & GEARING TRACK SYSTEM & CHASSIS COMMUNICATION SYSTEMS SATELLITE HOUSING

12 Subsystem Description MOTOR & GEARING –Two motors will be used to drive the rovor. –Each motor will be connected directly by gears to the wheels. COST & WEIGHT Weight of motor - 50 – 100 grams of weight. Cost of each motor – $50. Weight of gears (total) – 20 grams. Cost of gears (total) – $10.

13 Track System & Chassis Made from Aluminum Channel, aluminum angle, and small nuts and bolts. Wheels for track system made from R/C car wheels. Track made from rubber. “L” shaped brackets to hold motors. Tracks in a Triangle shape. Chassis made from Al angle open on bottom. Cost: $30-50 Weight: Approx. 350-400 grams

14 Tracks & Chassis

15

16 Communications Systems Onboard video camera. Transmitter for the video receiver from the camera. Remote control receiver with a 3 – 5 mile range. Remote control. Two onboard 12-v batteries to run electronics. A third battery for the motors. Brainstem to control all communication functions. Estimated total cost: $900 - $1200 Estimated total weight: 400 – 500 grams.

17 Satellite Housing Basic pyramid design Landing possibilities Solutions to deployment Attaching to tether Breaking the box Will cost between $10 - $50

18 Budget PROPOSED EXPENSES: (Approx.) –Motor and gearing: $110 –Track System & Chassis: $50 –Communication Systems: $1200 –Satellite Housing: $50 Total Expenses: $1410

19 Team 2

20 Major Subsystems RoverCaseCameraPower

21 General Diagram

22 Rover Front suspension Rear Suspension Main Chassis All main electrical components are contained on the chassis Has a rolled arch for added stiffness Solar plate mounted on hinge above chassis for cooling and light purposes Case Rectangular, rounded edges Durable & easy to build Camera Mounted on front of rover for maximum visibility System Description

23 Level Arm Mechanism Orientation

24 General Power Diagram

25 Components Mass (g) Tires (12grams X4) Chassis Video TX Video Antenna Rear end w/ motor Camera Li-POH battery Solar Cell R/C system(receiver) R/C micro servo 1(steering) R/C servo 2(lever arm) Suspension. A-Arms(8g X4) Shock Tower 48 48 28 28 300 300 60 60 170 170 130 130 538 538 280 280 9 18 18 41 41 42 42 10 10 Total Weight1692 Mass Budget

26 Structure

27 DemoSat Project Schedule


Download ppt "DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado 80401 303-273-3592 Critical."

Similar presentations


Ads by Google