Download presentation
Presentation is loading. Please wait.
Published byKristian Griffin Modified over 9 years ago
1
Using Geographical Information Systems to support new golf courses location in Montemor-o-Velho Municipality Sara Figueiredo, Turma SH Curso Sistemas de Informação Geográfica 02\05
2
Main goal Find the best location for a new golf course development in Montemor-o-Velho Municipality
3
Geoprocessing the colected information (classification, union, merge, overlay, area calculation) ArcView and Idrisi32; Compare the results with the Master Plan from Montemor-o- Velho. Objectives: Calculate aspect and slope from the DEM; Identify the suited geology; Identify the suited land use; Establish buffer zones around the main roads and water courses;
4
SLOPELess then 10% ASPECT South, East, West LAND USE Pastures or agricultural fields with low income and sandy soils HIDROGRAPHIC NETWORKBuffer zone greater then 100 m ROAD NETWORK Buffer zone of 50 m around the secondary roads. Buffer zone of 500 m around the main roads. GOLF COURSE AREA 9 holes, area between 20 and 30 hectares 18 holes, area between 40 and 60 hectares Good Locations
6
Possible locations
8
Final Remarks GIS revealed their usefulness in order to find suitable locations for new golf courses developments From the work developed it was possible to conclude: 1. According to the GIS results it is impossible to develop a new golf course with 18 holes; 2. But, it is possible to decide between 8 possible locations for a new golf course with 9 holes;
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.