Download presentation
Presentation is loading. Please wait.
Published byRafe Jackson Modified over 9 years ago
1
Governing Board Meeting 01SEPT09 David Peterson Assistant Superintendent - Operations
2
Electrical Consumption Decreased 3,533,602 kWh (6.3%) Electrical Costs only Decreased $36,129 (0.65%) SRP Rate Increase – 7.4% ($160,820) APS Rate Increase – 8.8% ($297,885) Reduced Water Usage by 2.5%
6
LOST $4,818,855 in Utility Funding Facing Additional Rate Increases Implemented Utility Scheduling Controls Classroom Temperature Settings Aligned Implementing Solar PV Projects Desert Mountain & Coronado HS (11¢/kW for 20 Years) Chaparral & Arcadia HS (Best & Final Offer Stage of Joint Purchase) Changing Solar Regulation for Schools in Arizona! Implementing Performance Contracting Projects DMHS: $3.2 M System Changes/Upgrades (Paid for with Guaranteed Energy Savings) Chaparral: $580,000 System Changes/Upgrades (Paid with Guaranteed Energy Savings) Implemented Computer Software Shutdown Requesting approval to participate in US Dept of Energy Recovery Act – Advanced Energy Efficient Building Technology Grant for Solar Cooling ($960,000) We must understand the Impact of Reduced Funding and the need to Conserve
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.