IT Pro Day Windows Server 2012 Hyper-V – The next chapter Michel Luescher, Senior Consultant Microsoft Thomas Roettinger, Program Manager Microsoft.

Similar presentations


Presentation on theme: "IT Pro Day Windows Server 2012 Hyper-V – The next chapter Michel Luescher, Senior Consultant Microsoft Thomas Roettinger, Program Manager Microsoft."— Presentation transcript:

1 IT Pro Day Windows Server 2012 Hyper-V – The next chapter Michel Luescher, Senior Consultant Microsoft Thomas Roettinger, Program Manager Microsoft

2 Agenda Hyper-V Replica VM-Mobility Networking Cross Platform Migration

3 15+ years of advanced datacenter development Global scale, 200+ services, 24x7 The world’s biggest apps

4 SystemResource Maximum number Improvement factor Windows Server 2008 R2Windows Server 2012 Host Logical processors on hardware643205× Physical memory1 terabyte4 terabytes4× Virtual processors per host5121’0242× Virtual Machine Virtual processors per virtual machine46416× Memory per virtual machine64 GB1 terabyte16× Active virtual machines3841’0242.7× Virtual disk size2 terabytes64 terabytes32× Cluster Nodes16644× Virtual machines1’0004’0004×

5 VM Mobility Shared Nothing Live Migration, Multiple Live Migrations, Storage Migration

6 Manage virtual machines independently from underlying infrastructure Handle changing needs on demand Live migration within a cluster Shared-nothing live migration Hyper ‑ V Replica Live migration of storage

7 Reads and writes go to the source VHD Reads and writes go to the source VHD. Live Migration Begins Disk contents are copied to new destination VHD Disk writes are mirrored; outstanding changes are replicated Live Migration ContinuesLive Migration Completes Destination Hyper ‑ V Virtual machine Target deviceSource device Virtual machine Source Hyper ‑ V IP connection Configuration data Memory content Modified memory pages Live Migration MEMORY VHD Increase flexibility of virtual machine placement Reduce downtime for migrations across cluster boundaries Increase administrator efficiency Benefits

8 Demo Shared Nothing Live Migration

9 Hyper-V Replica Business Continuity and Disaster Recovery

10  Replication changes are sent every 5 minutes  Additional recovery points can be configured  Incremental VSS copy for Application consistency  IP Injection for Replica

11 Log File 2 Primary Host VHD Log File 1 Fixed Replication Frequency Log to VHD converter Driver APP X Primary VM VHD Replica VM Replica Host

12

13

14  Place Page file on a separate VHDX  Network QOS for Replica Traffic  How to send Initial Replica?  Do I need more than one Replica listener?  Replica Folder name as GUIDs

15 Demo Hyper-V Replica

16 Network Network Teaming, QoS, SMB3

17  Up to 32 Network Cards  Unlimited Virtual Interfaces (t-nics)  Hyper-V distribution mode available  Switch Independent and dependent Mode

18  Use QoS to enable multi-tenancy and avoid overprovisioning in you datacenter  Minimum and Maximum Bandwidth options  Weight for Minimum Bandwidth allows oversubscription  DCB

19  What if I only have 1 Gbit/s Nics?  What if I have two 10 Gbit/s Nics?

20 Hyper-V Extensible Switch VM 1 VM n Live Migration Cluster / CSV Manageme nt VM 1 VM n Network Team Storage

21 Live Migration - tnic Cluster / CSV - tnic VM 1VM n Team 1 Hyper-V Extensible Switch Team 2 Management - tnic

22  SMB for Server Applications, Hyper-V & SQL  Active SMB File Sharing with Scale Out File Server  Scale, fast and efficient storage access with SMB Direct (RDMA up to 54Gbit/s!!)  Fault Tolerance with Multichannel SMB  VSS for file shares  SMB Encryption

23 Demo Networking, SMB 3

24 Cross Platform Migration Virtual Machine Converter

25

26

27 More Features So much that we just touched the surface

28  CDN  Extensible Switch  SR-IOV  Dynamic VMQ  Dynamic RSS  Router Guard  DHCP Guard  IP Sec Offload  Guest Fibre Channel Adapter  Guest NUMA  Dynamic Memory – Minimum Memory  Multiple Live Migrations  Cross Cluster Live Migration  CAU  CSV CACHE  Guest Application Monitoring  Startup Priorities  VHDX, TRIM/Unmap  ODX  Online Snapshot Merge  And much more

29

30 Windows Server 2012 Excitement

31

32

33

34 34 Build Plan Run Lifecycle Services Windows Client Consumerization Of IT Business Productivity On Premises CRM/ERP Custom Enterprise Applications Business Intelligence IaaS Private Cloud Dynamic Workplace Solutions IaaS Hybrid Cloud Business and Mission Critical solutions Business Productivity In the Cloud Datacenter Solutions Microsoft Enterprise Services is the enterprise strategy, consulting, and support division of Microsoft. We help businesses around the world achieve a maximized return on their investment in Microsoft products and technologies by helping plan, deploy, and run the IT initiatives that deliver the most business value. Microsoft Enterprise Services and its partners bring the deepest expertise of Microsoft solutions— from enterprise planning to deployment and support—that helps our customers innovate to strategic advantage in their respective industries.


Download ppt "IT Pro Day Windows Server 2012 Hyper-V – The next chapter Michel Luescher, Senior Consultant Microsoft Thomas Roettinger, Program Manager Microsoft."