Download presentation
Presentation is loading. Please wait.
Published byHeather Benson Modified over 9 years ago
1
B UILDING C HALLENGES : M ORE THAN T ALLEST, S TRONGEST, F ASTEST
2
M ARSHMALLOW C HALLENGE : B UILD THE T ALLEST F REESTANDING S TRUCTURE The top of the entire Marshmallow is the top: Use as much or as little of only the kit: Break up the spaghetti, string or tape: The challenge lasts 18 minutes: Teams cannot hold on to the structure when the time runs out. Those touching or supporting the structure at the end of the exercise will be disqualified. Alternate Boat Activity*
3
M ARSHMALLOW C HALLENGE Why would you use the activity? How would you use this activity? When would you use this activity?
4
M ARSHMALLOW C HALLENGE Lets hear from the experts… TED Talks, www.ted.comwww.ted.com
5
M ARSHMALLOW C HALLENGE, PURPOSE As described by Tom Wujec, what is the main purpose of doing the Marshmallow Challenge? Importance of Prototyping Finding the hidden marshmallow (in your endeavors). When “am I missing something”? Am I assuming something that I don’t recognize I am assuming?
6
B UILDING C HALLENGES, W HY ? Big Ideas / Content / Curriculum Goal for which to use a challenge… Prototyping Assumptions Physics/ Forces Creativity Writing prompt Collaboration
7
F ACTORS FOR A GOOD ACTIVITY : Time limit Uh oh factor Prototyping importance Continued success Collaboration
8
V ARIATIONS : B UILD A … Formula Story Equation Schematic Something that solves a problem
9
V ARIATIONS : R ESOURCES More resources http://www.pbs.org/wgbh/buildingbig/educator/act_cha_ei.html http://www.exploratorium.edu/structures/ Computer simulations: http://www.pbs.org/wgbh/nova/tech/build-bridge-p1.html Google search: bridge, building, games, challenge, simulation, physics olympics
10
P OST -C HALLENGE A CTIVITIES Debriefing: StructureTeam What worked? What to improve?
11
P OST -C HALLENGE A CTIVITIES Journaling Defining success Drawing, (forces, angles) Re-plan, Re-do Making connections to topic/standard
12
B RAIN H APPINESS, W HAT MAKES THESE FUN? Decision making Constructing and designing Social interaction Competition Completion and success Tool creation
13
W HEN CAN WE DO B UILDING C HALLENGES ? Fridays? Holidays? Video days? May? Before a concept? Anytime!!!!
14
B UILDING C HALLENGES : M ORE THAN T ALLEST, S TRONGEST, F ASTEST
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.