1
PHS - MAINTENANCE BUILDING SEISMIC STRENGTHENING PROGRAM/ MEASURE E BOND PROGRAM INVESTIGATION, ANALYSIS, AND PRELIMINARY CONCEPT October 24, 2007 R. P. Gallagher Associates Structural Engineers
3
SITE PLAN (E) WORKSHOP (E) STORAGE (E) TRAILER ( E) TRANSFORMER (E) TRAILER PIEDMONT MIDDLE SCHOOL
4
STRUCTURAL STRUCTURES DO NOT MEET ASCE 31 WOOD BUILDING AND TRAILERS WILL LIKELY FALL OFF SUPPORTS PREFAB UNLIKELY TO COLLAPSE, BUT MAY BE DAMAGED MEZZANINES DO NOT MEET CODE MANY NONSTRUCTURAL HAZARDS CONTINUED OPERATIONS SEVERELY IMPAIRED OR PREVENTED AFTER EARTHQUAKE ESSENTIAL IN PREPAREDNESS AND RECOVERY OPERATION
5
PATH OF TRAVEL NON COMPLIANT NO ACCESSIBLE ROUTE LACK OF CODE COMPLIANT DIRECTIONAL SIGNAGE STAIRS ARE NON COMPLIANT NO RAMP FOR WHEELCHAIR ACCESS NO ACCESSIBLE PARKING ADA / ACCESSIBILITY
6
EXTERIOR SIDES OF EXIT DOORS DO NOT HAVE HANDRAILS OR LANDINGS LACK OF PROPER EXHAUST SYSTEMS LACK OF OSHA COMPLIANCE NO FIRE ALARM UNSAFE STORAGE FIRE & LIFE SAFETY
7
VARIOUS OPTIONS : REPAIR EXISTING BUILDINGS REMOVE WOOD FRAME BUILDINGS AND TRAILERS, REPLACE WITH NEW BUILDINGS REPLACE ALL BUILDINGS
8
EXISTING NEW 1. NEW WORKSHOP/ UPGRADED METAL BUILDING PROJECT COST: $ 1 – 1.8 Million OUTCOMES: More functional 5 Standard parking spaces Meets ASCE 41 2,000 sf
9
EXISTING NEW 2. NEW WORKSHOP/ STORAGE/ OFFICES PROJECT COST: $ 2.7 Million OUTCOMES: 4000 sf new building Code compliant 5 truck parking spaces plus 3 standard parking spaces Efficient layout 4,000 sf
10
PHS – MAINTENANCE BUILDING PRISCILLA MECKLEY – ARCHULETA MIKE WASSERMANN JOHN NELSON RON GALLAGHER * For more information, visit http://www.pusdbond.org R. P. Gallagher Associates Structural Engineers