Download presentation
Presentation is loading. Please wait.
Published bySilvester Claud Simon Modified over 9 years ago
1
Preprocessing : status and plans Arjo Segers, Hans Cuijpers
2
stream 1 : tm3dam status: 0-9 days forecast massfluxes, temperature very fine grid plans: replace by glb3x2 ?
3
stream 2 : utophian status: 0-3 days forecast all TM3 input fields very fine grid plans: debug... replace by glb3x2 ? replace by TM5 input (surf fields on 1x1 etc)
4
stream 3 : od archive status: 31 levels: 1996 - 1997 on ‘fine grid’ 60 levels: 1999 - 2002 on glb3x2 plans: somebody interested in 1996-1999, 31 levs, glb3x2 ?
5
stream 4 : era40 archive status: 1997 – 2000 : processed on glb3x2 plans: 1957 – 1996 : to be processed 2001 – 2002 : to be processed special requests ?
6
Changes in TMPP code status: hdf files contain ‘content_version’ number increased if processing method changes (or debugged) see TMPP home page plans: new interface to ECMWF grib files: in theory very robust and flexible tested for ‘utophian’ stream not bug free yet...
7
Interface to TM meteo files plans: reads all existing types of TM meteo files eventually combines layers (e.g. 60 -> 25) eventually combines cells (e.g. glb3x2 -> glb6x4) status: in progress.... for the moment: generic interface to hdf4 files: www.knmi.nl/~segers/code
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.