Download presentation
Presentation is loading. Please wait.
Published byHarold Henderson Modified over 9 years ago
1
Status Report #4 Academic Presentation Timer Danny Cardenas Ignacio Carranza Edward Minter Joshua Roos February 18, 2008 Timing for public speaking excellence. EE4813 UTSADesign Team Six
2
News: Met with Professor Allo Front enclosure built EE4813 UTSADesign Team Six
3
Milestones: Microcontroller programming 70% done Front panel designed and wired Battery power supply secured Controller-Display interface designing began EE4813 UTSADesign Team Six
4
Ongoing: Interfacing Microcontroller with keyboard Testing display parts Building back panel EE4813 UTSADesign Team Six
5
New Tasks: Finish program controller clock (21 Feb) Testing parts and power(22 Feb) Interface keyboard with microcontroller (25 Feb) Design Web page(27 Feb) EE4813 UTSADesign Team Six
6
Microcontroller 60% Display 85% Power 20% User Interface 10% LCD Display 75% Enclosure 40% 0% 50% 0% 5% 20% EE4813 UTSADesign Team Six
8
????? EE4813 UTSADesign Team Six
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.