Download presentation
Presentation is loading. Please wait.
Published byShanon Small Modified over 9 years ago
1
T-76.4115 Iteration Demo Team DTT I1 Iteration 7.12.2005
2
T-76.4115 Iteration demo 2 Agenda Project status (10 min) achieving the goals of the iteration project metrics Work results (20 min) Project plan Requirements document Used work practices (5 min)
3
T-76.4115 Iteration demo 3 Introduction to the X-Connector project (1/2) Domain: process simulation, simulation model with several simulation engines (cluster) Deliverables: a user interface for defining data exchange between the cluster members a test server environment for prototyping the data exchange data synchronization scheme Technology: web service technology based on OPC specifications user interface as an Eclipse plug-in
4
T-76.4115 Iteration demo 4 Introduction to the X-Connector project (2/2) The customer of the project is VTT Industrial Systems Prioritized objectives: 1. User interface implementation and test server to store data exchange connection information 2. Synchronisation implementation for the test server cluster
5
T-76.4115 Iteration demo 5 Status of the iteration’s goals Goal 1: Design core architecture: OK: Components of the software (UI, DX interface, servers) are defined more thoroughly, key components’ design is finalized Goal 2: Plan and document quality assurance activities and practices OK: Documented in project plan chapter 5.2 Goal 3: Produce a first working version of the software with some core functionality OK: User interface with limited functionality Partially completed: static DX-configuration, test server Goal 4: Improve working methods OK: communication improved (MS Messenger, Wiki), more effective meeting practices used Goal 5: Create / update SEPA diaries OK Goal 6: Produce the plan for Implementation iteration 2 OK: planning on general level done, more specific plan will be delivered in the beginning of I2
6
T-76.4115 Iteration demo 6 Status of the iteration’s deliverables (1/2) Documents: Updated project plan OK: chapter 5.2 Quality assurance added, document updated Updated requirements document OK: descriptions of selected use cases added Technical specification OK: updated version of the document Test cases, test report and test log UI tests OK, but testing for the integrated system could not be done Updated SEPA diaries OK: All practices were used in I1 User’s instructions OK: Initial version of the user’s manual Progress report OK
7
T-76.4115 Iteration demo 7 Status of the iteration’s deliverables (2/2) Software: User interface (limited functionality) Create a workspace (UC1.1): OK Add/remove clusters (UC2.1, UC2.3): Unfinished Add servers to clusters (UC3.1): OK Add and remove connection groups (UC5.1, UC5.2): Unfinished Add and remove connections to groups (UC5.4, 5.5): Unfinished Browse OPC servers (UC8.1): OK TestSimulator Data Access Browsing of servers: OK Provides simulated server information from a static source: OK Provides dummy data: OK Data eXchange (UC4.1 – UC6.2) Provides DX web service interface: OK DXConfigurationWrapper: Removed (integrated in DXConfiguration) OPC XML DXKit: OK TestSimulator Data eXchange DX features: Unfinished
8
T-76.4115 Iteration demo 8 Realization of the tasks (1/2) Status and effort distribution per task group (4.12.2005) 44 tasks in total, 3 added during the iteration Remaining effort of project management for iteration demo and I2 planning Remaining effort of programming mainly for task ”Implement Server DX Functionality” which didn’t finish on time Remaining effort of QA for task ”Test DX configuration as a system” which was postponed to I2 SEPA-practices, especially heuristic evaluation, are more suitable to be used in I2
9
T-76.4115 Iteration demo 9 Realization of the tasks (2/2) Realized effort smaller than estimated (~425h vs. 514h) Effort needed to achieve the goals would have been ~460h
10
T-76.4115 Iteration demo 10 Working hours by person Coding was started one week behind the schedule 20% of the effective development time lost Christmas vacation will be (at least) one week shorter.. Separate components could not be integrated, because one DX component did not finish on time System testing could not be done (Ville and Tomi could not use 20 budgeted hours) Realized hours in this iteration
11
T-76.4115 Iteration demo 11 Working hours by person Realized hours in I1 iterationPlan in the beginning of this iteration Latest plan 51% of the effort used at the moment Work done during christmas vacation is counted to I2
12
T-76.4115 Iteration demo 12 Quality metrics No critical or blocker bugs found 4 unfixed defects at the moment (all minor) Weekly code reviews I1I2Total Reported 44 Closed 00 Open 44 Bug metrics BlockersCriticalMajorMinorTrivialTotal Total open 000404 This iteration reported 000404
13
T-76.4115 Iteration demo 13 Quality assessment User interface showed good quality No blocker, critical or major defects! Thorough testing of implemented features Only 4 minor defects were found OPC XML DXKit has been tested only by the developers during the development process Formal test session will be arranged after the integration Quality of the implemented software modules is good, but the integration has not yet been made. Thus, no conclusions of the quality as a system can be made Functional areaCoverageQualityComments User interface2 Test session arranged, 4 minor defects found OPC XML DXKit1 Briefly tested by the developer TestServer2 Test session arranged, no bugs found Legend Coverage: 0 = nothing 1 = we looked at it 2 = we checked all functions 3 = it’s tested Quality: = quality is good = not sure = quality is bad
14
T-76.4115 Iteration demo 14 Software size in Lines of Code (LOC) as of 4.12 The numbers for each component shows the LOC without comments. The percentage indicates the amount of comments of the total LOC. The PP column shows LOC for the code provided by the customer DXConfiguration and OPC XML DX Kit contain auto generated code as well as user code As this project contains both auto generated code and code obtained from the customer, it is not very easy to use this as a reliable metric. It is, however, interesting touse this for comparing the code output in different components. PPI1I2 User interface / Eclipse plugin-3174 (16%)- Test Server450 (44%)5178 (19%)- OPC XML DX Kit -28395 (5%)- DXConfiguration -3807 (18%)- Total (NCLOC + COM) 450 (44%)40554(9%)- Comments (COM) 3534149-
15
T-76.4115 Iteration demo 15 Changes to the project Goals of the project Implementation of the fast data access was removed Goals of the coming iterations Some features planned for I1 not yet finished and have to be postponed We will finish most of these before the official start of I2 Synchronization scheme is the main goal of I2 Requirements New requirements added Many requirements have been re-specified during I1 Technologies Client side web service functions implemented in Java/Axis instead of C++/gSoap DXConfigurationWrapper removed
16
T-76.4115 Iteration demo 16 Risks Current situation regarding the risks Risk log in the project plan: 10 risks with their effects, estimated impacts and probabilities, persons responsible 2 risks realized during I1 The customer’s CVS server was inaccessible for a week and delayed the start of development work Problems in understanding the project domain caused delays Identified risks A team member quits in the middle of the project or something happens (accident, sickness etc.) New technologies cause problems The customer is developing some software components that will be used in the project but fails to deliver them in time Requirements change in the middle of the project Workload of the whole project is underestimated Workload of iteration I1 is underestimated and (software) deliverables won’t finish on time Developed software components are incompatible One of the group members has difficulties to stay on schedule Difficulties in understanding the project domain Problems with the customer’s CVS server
17
T-76.4115 Iteration demo 17 Results of the iteration System architecture Updated requirements document QA plan Demonstration of the developed software
18
T-76.4115 Iteration demo 18 System architecture The system consists of a server and a user interface The server is implemented in C++ and the UI components in Java
19
T-76.4115 Iteration demo 19 Requirements document Functional requirements 21 (and 1 deleted) functional requirements New functional requirements have been added Existing requirements have been re-specified Use cases 31 (and 4 deleted) use cases Many additions during I1 Existing use cases have been re-specified Use case IDs have been renamed Use case list has been re-organized Detailed descriptions of selected use cases Non-functional requirements No changes
20
T-76.4115 Iteration demo 20 QA plan 1 test session Software modules (except UI) were tested only by the developers (no test sessions) System integration was postponed the whole system couldn’t be tested BugZilla wasn’t really used during I1 No real need, because there has been only 1 developer per module Bugs found in the test session have been reported to BugZilla Weekly code reviews were held No defects found in code reviews Good for coming up with solution ideas and for keeping the management team up-to-date
21
T-76.4115 Iteration demo 21 Demo script Server Start the server Use the server specification text file as a parameter Locate IP address of server User interface & Server Start up the user interface in Eclipse Connect to the first DA server, OPC foundation’s test server http://opcfoundation.org/XmlDaSampleServer/Service.asmx http://opcfoundation.org/XmlDaSampleServer/Service.asmx (or in case it is not online, http://www.tswinc.us/xmldademo/xml_sim/OpcXmlDaServer.asmx) http://www.tswinc.us/xmldademo/xml_sim/OpcXmlDaServer.asmx Port 80 Connect to the Test server Port 8081 Browse the DA trees Open subtrees Show properties Drag & Drop nodes between the two servers Enter needed attributes in the window which is opened
22
T-76.4115 Iteration demo 22 Used work practices Practices used in I1 iteration Iterative development: OK Iteration planning: OK, task list had to be updated several times Documenting: OK Risk management: Risk log updated Time reporting: Effort management tool was used to produce status reports weekly Size reporting: OK Version control: CVS in use, all versions of the documents was published in project’s web site Communication: Problems of the PP-iteration were tackled with Messenger and Wiki Meeting practices: Weekly meetings more effective than in PP Defect tracking: BugZilla will be used more in I2 Heuristic evaluation: SEPA-topic Refactoring: SEPA-topic
23
T-76.4115 Iteration demo 23 Thank you! Any questions?