Presentation is loading. Please wait.

Presentation is loading. Please wait.

 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.

Similar presentations


Presentation on theme: " Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University."— Presentation transcript:

1  Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research sylwia.wojnarska@cern.ch Warsaw University of Technology

2 Platform on the roof of 3184 building

3 Dimensions of the platform

4

5

6 Dimensions of the platform with tank and condenser (made from 2D drawings)

7 Pipe integration

8

9 Location of the valves

10 Two pipes:  Yellow pipe – DN 200, vapour pipe from Manifold to Balcony Unit  Orange pipe – DN 50, liquid pipe from Balcony Unit to Manifold

11 Dimensions and path of the Yellow pipe

12 There is no space between existing pipes and the dark blue unit, but there is a gap between floors

13 Dimensions and path of the Orange pipe

14 View from inside

15

16

17

18 View from inside – compressor room – over the entrance door

19 View from inside – compressor room

20 View from inside – manifold

21

22

23 Sylwia Wojnarska CERN - European Organization for Nuclear Research sylwia.wojnarska@cern.ch Warsaw University of Technology


Download ppt " Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University."

Similar presentations


Ads by Google