Download presentation
Presentation is loading. Please wait.
Published byKevin Black Modified over 9 years ago
1
Roof integration USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research sylwia.wojnarska@cern.ch Warsaw University of Technology
2
Platform on the roof of 3184 building
3
Dimensions of the platform
6
Dimensions of the platform with tank and condenser (made from 2D drawings)
7
Pipe integration
9
Location of the valves
10
Two pipes: Yellow pipe – DN 200, vapour pipe from Manifold to Balcony Unit Orange pipe – DN 50, liquid pipe from Balcony Unit to Manifold
11
Dimensions and path of the Yellow pipe
12
There is no space between existing pipes and the dark blue unit, but there is a gap between floors
13
Dimensions and path of the Orange pipe
14
View from inside
18
View from inside – compressor room – over the entrance door
19
View from inside – compressor room
20
View from inside – manifold
23
Sylwia Wojnarska CERN - European Organization for Nuclear Research sylwia.wojnarska@cern.ch Warsaw University of Technology
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.