Challenges in Wind Turbine Components Charles D. Schultz, PE Beyta Gear Service Winfield, Illinois
2
What is going on in Wind Energy?
3
Activity on a national scale
4
Progress has been made but much remains to be done!
5
It is all about jobs!
6
Domestic Content Progress
7
US Wind Resource Map US is the “Saudi Arabia” of wind Transmission of power from central plains to coasts is a problem Even states that aren’t “colorful” have wind potential
8
Examples of Components Blade Hubs are huge castings – up to 15,000 pounds Gearbox Assemblies weigh up to 60,000 pounds and are getting larger Chassis are big fabrications or castings – up to 40,000 pounds and getting larger
9
Towers & Blades Transport issues, 50 meter lengths & 40 ton weights High cost items Potential for big improvements Big incentive to make locally
10
Big Market, Long Term Potential
11
Where are the problems?
12
Quality is a given Due to high cost of warranty work all parts have strict quality specifications Tolerances test equipment capabilities Documentation requirements similar to aircraft industry Little acceptance of non-conformances Metallurgical cleanliness at aircraft levels Expect to cut up lots of samples for metallurgical checks
13
Consistency is Mandatory Expect customers to dictate suppliers, methods, and even tooling Customers will have quality observers in your facility Once a method is approved changes are difficult to make Rework –especially in thermal processing- is subject to extreme scrutiny
14
Big portion of value is in the Nacelle
15
Large, precision gearboxes required Aerospace precision in a mining machine sized package Quality levels far in excess of industrial equipment Huge warranty and maintenance costs
16
Other Geared Products
17
Planetary designs predominate
18
Typical Gearbox Parts
19
Typical Pinion Not dissimilar to industrial gearing Large cross sections challenge heat treat response 18CrNiMo7-6 typical material Current weights up to 2500 pounds and getting bigger
20
Typical Sun Pinion Large thru hole helps heat treat response 18CrNiMo7-6 typical material Heat treat distortion common Current weights up to 2000 pounds and getting bigger
21
Typical Gear Not dissimilar to industrial gears Large cross sections challenge heat treat response 18CrNiMo7-6 typical material Super finishing issues Current weights to 10,000 pounds and getting bigger
22
Typical Splined Hub Typically thru hardened but some nitrided or induction hardened Length [up to 30”] is a shaping challenge 42CrMo4 typical material Current weights up to 2500 pounds and getting bigger
23
Typical Ring Gear As large as 3 meters Many thru hardened Nitriding popular Induction hardening is also used Carburizing possible but problematic Shot peening and super finishing issues
24
Typical Planet Lots of planets needed; 3, 4, or 5 per stage Precision size matching within sets 18CrNiMo7-6 typical material Current weights up to 2200 pounds and getting larger
25
Serial Production – not job shop! 7,000 turbines per year = 27 per day 10,000,000 cars per year = 38,462 per day Typical large industrial gear shop does less than 5 gearboxes per day Aircraft production –similar in quality and complexity – is on the order of 1000 per year
26
Thermal Processing Issues Large parts require large furnaces Economic load sizes typically over 5,000# Large teeth require deep cases Cycle times of 60+ hours not uncommon Aerospace quality required at all steps
27
Volume & price pressure drive equipment purchases Customers want lowest possible costs Existing job shop equipment can’t keep up New technology offers improved quality with faster cycle times
28
Dramatic Cycle Time Reductions Possible Shaping an internal ring takes 30 hours Gashing takes 3 hours Hobbing a gear can take 8 to 10 hours Gashing takes less than 2 hours
29
Big non-chip making investments needed SPC needed on everything 100% magnaflux, UT, & nital etch typical Shot peening required on everything Full met lab checks on every furnace load Verification of geometry requires big CMM Everything that can be inspected must be inspected
30
Big investments needed in QC Super Finishing required on many components To achieve 4 to 8 AA surface finish
31
An Industrial Challenge worthy of a great nation! Potential to transform the economy Positive environmental impact Huge export market available US was once the world leader in wind energy and can be once again Plenty of room for innovation at all levels of the business