MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross
2
MCTF 8/17/06 A. Bross MuCool Program Currently consists of 9 institutions from the US and Japan RF Development ANL Fermilab IIT JLAB LBNL Mississippi Absorber R&D Fermilab IIT KEK NIU Mississippi Osaka Solenoids LBNL Mississippi Mission u Design, prototype and test all cooling channel components (SFOFO) u 201 MHz RF Cavities, absorbers, SC solenoids u Support MICE (cooling demonstration experiment) u Perform high beam-power engineering test of cooling section components
3
MCTF 8/17/06 A. Bross R&D Focus of MuCool u Component testing Fermilab s RF Cavities –High RF-power Testing s Absorbers –Technology tests –High power-load testing With beam s Magnets
4
MCTF 8/17/06 A. Bross MuCool Test Area Facility to test all components of cooling channel (not a test of ionization cooling) u At high beam power s Designed to accommodate full Linac Beam s 1.6 X 10 13 p/pulse @15 Hz – 2.4 X 10 14 p/s – 600 W into 35 cm LH 2 absorber @ 400 MeV u RF power from Linac (201 and 805 MHz test stands) s Waveguides pipe power to MTA
5
MCTF 8/17/06 A. Bross MTA Hall
6
MCTF 8/17/06 A. Bross MTA The MTA is the focus of our Activities u RF testing (805 and 201 MHz) u High pressure H 2 gas- filled RF u LH 2 Absorber tests Two parts of infrastructure yet to be completed u Cryo Plant u Beam Line
7
MCTF 8/17/06 A. Bross Phase I of RF Cavity Closed Cell Magnetic Field Studies (805 MHz) Data seem to follow universal curve u Max stable gradient degrades quickly with B field Sparking limits max gradient Copper surfaces the problem Gradient in MV/m Peak Magnetic Field in T at the Window
8
MCTF 8/17/06 A. Bross Phase II of 805 MHz studies Study breakdown and dark current characteristics as function of gradient and applied B field in Pillbox cavity u Curved Be window Test s TiN coated s Cavity has been conditioned to 32MV/m without B field s Measurements at 2.5T –So Far – stable gradient limited to about 14MV/m u Button test s Evaluate various materials and coatings s Quick Change over
9
MCTF 8/17/06 A. Bross RF R&D – 201 MHz Cavity Design The 201 MHz Cavity is now operating u Recently reached 16MV/m at B=0 (design gradient!)
10
MCTF 8/17/06 A. Bross 2D Transverse Cooling and Figure of merit: M=L R dE /ds M 2 (4D cooling) for different absorbers Absorber Design Issues H 2 is clearly Best - Neglecting Engineering Issues Windows, Safety
11
MCTF 8/17/06 A. Bross Convective Absorber Activities First Round of studies of the KEK absorber performed in the MTA u GHe used to input power
12
MCTF 8/17/06 A. Bross Convective Absorber Activities II
13
MCTF 8/17/06 A. Bross Convective Absorber Activities III Next Round of tests will use a modified absorber Test u Electrical Heater u New Temperature sensors u LH liquid level sensor Absorber Body being modified in Lab 6 at Fermilab Instrumentation will be used in MICE
14
MCTF 8/17/06 A. Bross MuCool and MICE Muon Ionization Cooling Experiment (MICE) u Demonstration of “Study II” cooling channel concept s Has Phase I UK funding ($20M) MuCool Collaboration interface to MICE u Design Optimization/develop of Study II cooling channel s Simulations u Detailed engineering s Full component design s Systems integration s Safety u RF cavity development, fabrication, and test u Absorber development, fabrication, and test u Development of beam line instrumentation u MuCool will prototype and test cooling hardware including MICE pieces for which the collaboration is responsible Fermilab is also contributing to the cryogenics and readout electronics for the two fiber trackers used in the spectrometers.
15
MCTF 8/17/06 A. Bross MTA recent activities Due to Tritium problem from Numi u Our cooling water feed for the MTA hall was changed to Casey’s pond s Introduced some problems that have now been remedied LHe delivery system for magnet has been upgraded u Heat load now at spec 5T Solenoid has been re-trained u Now operates at spec Instrumentation Installed u Spark protection for 201 cavity s Includes video camera and DVR u Scintillation counters s Now have complete coverage for 805 and 201 systems s Includes thin and thick Plastic counters and NaI
16
MCTF 8/17/06 A. Bross Plans for the MTA 805 MHz RF studies (with and without B field) u Long-term (1 week) conditioning at fixed gradient and 2.5T u Be Window tests u Materials tests u Surface treatment 201 MHz RF test program u B field tests s Conditioning to highest possible gradient (up 16MV/m) at max field available from magnet u Curved Be Windows u Note: The 201 MHz power source from the Linac has been offline since before the end of the shutdown s Hope to have it available for our program in the next week or two Second round of tests with KEK LH 2 convective absorber 201 MHz RF is Highest Priority!