Presentation is loading. Please wait.

Presentation is loading. Please wait.

GONIOMETER FOR TEST BEAM MEASUREMENTS Yury Gavrikov (PNPI, Gatchina, Russia) UA9 Collaboration meeting 2012.04.19 1.

Similar presentations


Presentation on theme: "GONIOMETER FOR TEST BEAM MEASUREMENTS Yury Gavrikov (PNPI, Gatchina, Russia) UA9 Collaboration meeting 2012.04.19 1."— Presentation transcript:

1 GONIOMETER FOR TEST BEAM MEASUREMENTS Yury Gavrikov (PNPI, Gatchina, Russia) UA9 Collaboration meeting 2012.04.19 1

2 Goniometer in H8 runs 2

3 The goniometer for test beams “Sandwich” of stages for test beam: Precision Linear Stage PLS-85 Ultra Precision Rotation Stage UPR-120 (new) Linear Motor Stage LMS-60 (new) Goniometer WT-85 4 axis Controller - SMC hydra (new) 3

4 4 PI (Physik Instrumente) + miCos GmbH = The new set of stages from the company PI-MICOS http://www.pimicos.com

5 Precision Linear Stage PLS-85 Travel range up to 102 mm Uni-directional repeatability down to 1 µm Bi-directional repeatability down to +/-1 µm Resolution typical 1 µm Load capacity up to 10 kg Integrated limit switches 5

6 Ultra Precision Rotation Stage UPR-120 Uni-directional repeatability down to 0.00008 ° (1.4 μrad) Flatness and eccentricity± 3 μm Flatness (Bearings)± 1 µm Eccentricity (Bearings) ± 3 µm Wobble ± 25 μrad High-precision bearings Integrated optical ref. switch Integrated angular scale 6

7 Linear Motor Stage LMS-60 Linear Motor Travel range up to 65 mm Uni-directional repeatability down to 0.1 µm Straightness / Flatness (µm) Load capacity up to 3 kg Integrated limit switches Integrated linear scale 7

8 Linear Motor Stage LMS-60 Uni-directional repeatability down to 0.0005 ° (8.7 urad) Precise, smooth continuous 10° motion Clear aperture 30 mm 8

9 Motion Controller SMC hydra 4 axis controller (19”) Stepper, linear, torque motors 1, 2, 3 phase and piezo motors Ethernet 10/100 MBit RS-232 up to 115.2 kbaud VENUS-3 command language Scalable solution 9

10 Perspectives Total cost of 4-axis goniometer with conrtoller ~ 32 k€ Covered by INFN (2/3) and CERN (1/3) Arrival to CERN in 12-14 weeks (middle of July 2012) The control software should be adapted before the H8 run 10

11 Happy test beams 2012 11


Download ppt "GONIOMETER FOR TEST BEAM MEASUREMENTS Yury Gavrikov (PNPI, Gatchina, Russia) UA9 Collaboration meeting 2012.04.19 1."

Similar presentations


Ads by Google