SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.

Similar presentations


Presentation on theme: "SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie."— Presentation transcript:

1 SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie 800 de Maisonneuve est, 22ième étage Montréal, QC H2L 4M8

2 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie2 SC B5- STRATEGIC PLAN Improve concepts of SAS Improve concepts of SAS Network of the future and Distributed generation Network of the future and Distributed generation New System Integrity Protection Schemes to improve network stability (Load Shedding/Restoration/SPS) New System Integrity Protection Schemes to improve network stability (Load Shedding/Restoration/SPS) Requirements from users Requirements from users Process Bus (architecture, reliability, transients and testing) Process Bus (architecture, reliability, transients and testing) New approaches, tools and system to eliminate human errors New approaches, tools and system to eliminate human errors

3 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie3 SC B5- STRATEGIC PLAN Protection coordination Protection coordination Standardization of schemes and functions of protection Standardization of schemes and functions of protection Communication in 61850 between substations (interoperability) Communication in 61850 between substations (interoperability) Consideration of Cyber Security Constraints Consideration of Cyber Security Constraints Synchrophasor Applications Synchrophasor Applications Internet and Remote access Internet and Remote access

4 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie4 SC B5- STRATEGIC PLAN Impact of power electronics on P & SAS Impact of power electronics on P & SAS Life Time Assessment of P & SAS Life Time Assessment of P & SAS New wide area protection and control systems (WAP&C) for Renewable energy and non conventional generation and devices New wide area protection and control systems (WAP&C) for Renewable energy and non conventional generation and devices Provision of data collection and processing for monitoring, recording and fault analysis (including Power Quality and Equipment monitoring) Provision of data collection and processing for monitoring, recording and fault analysis (including Power Quality and Equipment monitoring) Application of Automatic and adaptive functions Application of Automatic and adaptive functions Establish guidelines for numerical Protections Establish guidelines for numerical Protections Metering aspects Metering aspects

5 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie5 Advisory Group Membership AG51 V. Leitoff (FR)AG52 S. Chano (CA) AG53 R. Adams (UK) AG54 I. Mesmaeker (CH) Substation Automation and Remote Control Protection & Monitoring of Main Plant and Circuits Monitoring, Metering, Recording and Overall Power System Protection Tutorials

6 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie6 AG B5-51 Substation Automation and Remote Control WG B5-38: Impact of security requirements D. Holstein (US) Finished WG B5-36: Applications for protection schemes based on 61850 D. Tholomier (FR) 2010 WG B5-33: Acceptable functional Integration. in HV SS‘s A/ Apostolov (US) Finished WG B5-32: Functional Testing of 61850 based systems I Patriota (BR) Finished: Electra Publication WGB5-08: Refurbishment Strategies etc. P.Leushuis (NL) Finished WG B5-31: Management of protection settings P. Crossley (UK) 2010 WG B5-12: Engineering guidelines for IEC61850 based systems JCastellanos (ES) 2010 WG B5-06: Maintenance strategies for SAS VLeitloff (FR) 2010

7 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie7 AG B5-52 Protection & Monitoring of Main Plant and Circuits WG B5-10: Protection of series compensated lines J. Zakonjsek (SE) Finished WG B5-37: Protection, control & monitoring of shunt reactors. ?? (CA) 2012 WG B5-04: Tech‘s for protection & monitoring generator plant G Benmouyal (CA) 2010 WG B5-07: Tech‘s for protection & monitoring transmission lines S Chano (CA) 2010 WG B5-05: Transformer protection, monitoring & control M. Sachdev (CA) Finished WG B5-16: Modern Techniques for BBP Z. Gajic (SE) Finished WG B5-12: Engineering guidelines for IEC61850 based systems JCastellanos (ES) 2010 WG B5-06: Maintenance strategies for SAS VLeitloff (FR) 2010

8 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie8 AG B5-53 Monitoring, metering, recording & overall System Prot. AG B5-53 Monitoring, metering, recording & overall System Prot. WGB5-20: New trends for auto fault & dist. analysis M Kezunovic (US) Finished WGB5-19: Protection relay coordination H. Kameda (JP) Finished WG B5-94: High Impedance Faults I Ojanguren (ES) Finished WG B5-34: Impact of renewable energy sources & dist. gen. on S/SP&A J Gonzalez (ES) Finished WG B5-21: New local P&C approaches to minimise impact of system distubances A H Abu Bakar (MY) 2011 WG B5-14: WA P & C Technologies V Terzija (UK) 2012

9 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie9 NEWLY FORMED WG B5 WG B4/B5.25 Impact of HVDC Stations on Protection of AC Systems – Canadian member WG B4/B5.25 Impact of HVDC Stations on Protection of AC Systems – Canadian member WG B5.22 Standardised Protection Schemes WG B5.22 Standardised Protection Schemes WG B5.23 Protection of hybrid line/cable circuits in transmission networks – Canadian member WG B5.23 Protection of hybrid line/cable circuits in transmission networks – Canadian member WG B5.24 Protection Requirements on Transient Response of Voltage and Current Digital Acquisition Chain WG B5.24 Protection Requirements on Transient Response of Voltage and Current Digital Acquisition Chain

10 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie10 South Korea-October 19 to 24 PREFERENTIAL SUBJECTS (2009) Highlights: Highlights: Strategies for the Lifetime Maintenance of SAS Systems (new WG) Strategies for the Lifetime Maintenance of SAS Systems (new WG) Protection & Control of FACT devices and impact on Protection Systems Protection & Control of FACT devices and impact on Protection Systems Wide Area Monitoring, Control & Protection Technologies Wide Area Monitoring, Control & Protection Technologies

11 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie11 PREFERENTIAL SUBJECTS (2010) Protection Control & Monitoring Beyond 2015 – Allocation of P&C Functions - Architecture of SAS – New concepts – New requirements – Recording Protection Control & Monitoring Beyond 2015 – Allocation of P&C Functions - Architecture of SAS – New concepts – New requirements – Recording Impact of renewable generation and cogeneration on Substation automation and Protection Impact of renewable generation and cogeneration on Substation automation and Protection

12 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie12 TUTORIAL SUBJECT FOR 2009 Experience in the protection of circuits & multi-terminal lines and power transformers Experience in the protection of circuits & multi-terminal lines and power transformers

13 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie13 Canadian participation-2009 Leadership roles Leadership roles –Simon Chano (HQ) B5 Canadian Representative B5 Canadian Representative B5-52 Advisory group member B5-52 Advisory group member Convenor WG B5-07 Convenor WG B5-07 B5-23 WG member B5-23 WG member Corresponding member WG B5-19 Corresponding member WG B5-19 Corresponding member B5-05 Corresponding member B5-05 –Gabriel Benmouyal (SEL) Convenor WG B5-04 Convenor WG B5-04

14 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie14 Canadian participation Leadership roles Leadership roles –Mohindar S. Sachdev (U of Saskatchewan) Convenor WG B5-05 Convenor WG B5-05 Member WG B5-07 Member WG B5-07 –Brian Sparling Corresponding Member WG B5-05 Corresponding Member WG B5-05

15 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie15 Canadian participation Leadership roles Leadership roles –Bogdan Kasztenny (SEL Inc.) Member WG B5-12 Member WG B5-12 –John Ciufo (Ontario Hydro) Member WG B5-14 Member WG B5-14 –Ioni T. Fernando (Manitoba Hydro) Member WG B5-25 Member WG B5-25

16 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie16 Concluding Remarks Study committee actively examines protection and automation issues Study committee actively examines protection and automation issues Discusses the issues and provides reports on those issues Discusses the issues and provides reports on those issues Promotes power engineering education Promotes power engineering education Conducts tutorials at the SC meetings Conducts tutorials at the SC meetings B5 tries to get participation from utility engineers, consultants and academia B5 tries to get participation from utility engineers, consultants and academia

17 2009 - 10 -04 Simon R. Chano, Hydro Québec TransÉnergie17 http://www.cigre-b5.org Web site SC address : web site is SC address : web site is Pour information additionnelle /For additional information, me contacter / you can contact me: Chano.simon@hydro.qc.ca Pour information additionnelle /For additional information, me contacter / you can contact me: Chano.simon@hydro.qc.ca Chano.simon@hydro.qc.ca


Download ppt "SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie."