Presentation is loading. Please wait.

Presentation is loading. Please wait.

Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependability Foundations for Information infrastructures - Network of Excellence DeFINE.

Similar presentations


Presentation on theme: "Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependability Foundations for Information infrastructures - Network of Excellence DeFINE."— Presentation transcript:

1 Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependability Foundations for Information infrastructures - Network of Excellence DeFINE CESI position in DeFINE Giovanna Dondossola Automation and Information Business Unit

2 Open Workshop, Pisa, November 2002 VI Framework DeFINE 2 CESI history  large investments in testing facilities to qualify Italian electromechanical Industry  skills on power system analysis for the development of the national grid CESI was founded in 1956 with the support of the Italian electrical utilities and electromechanical manufacturers and aimed at concentrating:

3 Open Workshop, Pisa, November 2002 VI Framework DeFINE 3 Our history Our history (continued)  widening the range of services offered to the national & international market in the electro- energetic and environmental sectors  developing “full range approaches and solutions” to the market r 2000. With the liberalization of the Italian Electrical System Enel Research is incorporated in CESI with the aim of:

4 Open Workshop, Pisa, November 2002 VI Framework DeFINE 4 The shareholders Enel 26% Terna 15% Interpower3% GRTN, Sogin12% ABB, Alstom, Ansaldo, Pirelli, Vatech, Siemens 29% Edison, Sondel, Aem Milan, Aem Turin, Endesa Italia, Eurogen 15% Share capital: 8.55 Million Euro Equity: 20.76 Million Euro

5 Open Workshop, Pisa, November 2002 VI Framework DeFINE 5 Personnel (01.03.02): 1052 Our figures Turnover 2001:123.7 million € Facilities area: 300,000 m 2

6 Open Workshop, Pisa, November 2002 VI Framework DeFINE Our organization structure T & D Networks D. Lucarella Managing Director G. Santagostino Environment A. Pigini Industry, End Uses & Renewables A. Porrino Generation P. Motta Tests & Components V. Scarioni Certification U. Colombo Personnel, Organization & Quality L. Anelli Sales F. Giornelli Research & Product Development R. Buccianti Administration & Finance V. Della Bona Automation & Information Techn. A.R. Tiramani Business Units Departments

7 Open Workshop, Pisa, November 2002 VI Framework DeFINE 7 Research Goals  To address the evolution of tools supporting dependability in electric automation systems  by including support to dependability in pre- existing development tools  by developing techniques allowing to improve the efficiency of formal analysis processes  by developing efficient fault tolerance solution applicable to real time control

8 Open Workshop, Pisa, November 2002 VI Framework DeFINE 8 Methods and Tools UML-CD Customized UML-CD Predefined TRIO Customized TRIO Parametric GSPN Customized GSPN UML Behavioural diagrams Modeller experience Rules and predefined models Automatic translation Customization guidelines Customization and refinement Info from customization

9 Open Workshop, Pisa, November 2002 VI Framework DeFINE 9 Technologies  Rigorous design & Formal V&V  temporal logic approach: Modular TRIO dialect [FAST European project www.prover.com/FAST  construction of dependability strategy specifications  application independent vs. application dependent parts  techniques for pruning the model generation process (e.g. use of Abstract Test Cases)  automatic generation of fault injection cases from specification  testing and simulation with fault injection  risk analysis methodology (collaboration with JRC)  threats, vulnerability, attacks characterisation  security functions and their correlation to threats/attacks

10 Open Workshop, Pisa, November 2002 VI Framework DeFINE 10 Cont.  Fault tolerance  mechanisms for tolerating transient and permanent faults in real time control  intrusion tolerance components for protecting the automation infrastructure from external/internal malicious agents  Evaluation of fault tolerance solutions measures from modelling

11 Open Workshop, Pisa, November 2002 VI Framework DeFINE 11 Central Topics  Open information infrastructure securing the open communication infrastructure for providing the Level of Service required by Remote Functions of Electric System  Embedded systems efficient faul tolerance satisfying real time constraints of cyclic applications  Critical infrastructure interdependencies Electric Network & ICT infrastructure

12 Open Workshop, Pisa, November 2002 VI Framework DeFINE 12

13 Open Workshop, Pisa, November 2002 VI Framework DeFINE 13 Editor Window: PSAS System

14 Open Workshop, Pisa, November 2002 VI Framework DeFINE 14

15 Open Workshop, Pisa, November 2002 VI Framework DeFINE 15 CESI event  CESI is member of Cigré WG 37-35 on  Information technology development and its effect on the economy, security and market operation of power systems www.cigre-drustvo.si/slokcig/index-ANG www.cigre-drustvo.si/slokcig/index-ANG  representatives from several European electric utilities  a main goal: survey the technological development of Information Technology (IT) and its future trend in power sector  next meeting in January 2003 hosted by CESI, involving major IT producers for power systems (ABB, SIEMENS, ALSTOM, SELTA,...) and Operators (GRTN)


Download ppt "Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependability Foundations for Information infrastructures - Network of Excellence DeFINE."

Similar presentations


Ads by Google