Download presentation
Presentation is loading. Please wait.
Published byKerry Little Modified over 9 years ago
1
LS1 Project
2
Weld in dowel holes to move head over bores
3
Index and install new dowel hole.
4
Remove seat rings for larger valves
5
Port cylinder head
6
Cut manifold in half for offset of heads
7
Flow head and manifold
8
With manifold cut in half, that makes porting easier.
9
A second view
10
Weld manifold together again
11
A better look at the offset
12
The bolt holes need to be offset also.
13
Finished bolt holes
14
Finished chambers
15
Rectangular port option
16
Springs and rocker pads
17
For further information; Call 845 473 1136 E-mail info1@dambest.cominfo1@dambest.com Thanks for your time, have a great day, John
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.