Presentation is loading. Please wait.

Presentation is loading. Please wait.

LS1 Project. Weld in dowel holes to move head over bores.

Similar presentations


Presentation on theme: "LS1 Project. Weld in dowel holes to move head over bores."— Presentation transcript:

1 LS1 Project

2 Weld in dowel holes to move head over bores

3 Index and install new dowel hole.

4 Remove seat rings for larger valves

5 Port cylinder head

6 Cut manifold in half for offset of heads

7 Flow head and manifold

8 With manifold cut in half, that makes porting easier.

9 A second view

10 Weld manifold together again

11 A better look at the offset

12 The bolt holes need to be offset also.

13 Finished bolt holes

14 Finished chambers

15 Rectangular port option

16 Springs and rocker pads

17 For further information; Call 845 473 1136 E-mail info1@dambest.cominfo1@dambest.com Thanks for your time, have a great day, John


Download ppt "LS1 Project. Weld in dowel holes to move head over bores."

Similar presentations


Ads by Google