Download presentation
Presentation is loading. Please wait.
Published byKory Richards Modified over 9 years ago
1
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 JPL Update Danan Dong Michael Heflin Sharon Kedar Brian Newport Frank Webb
2
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Overview GIPSY Processing status NASA REASoN Project Status
3
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Processing Bias fixing strategy –5-7 Clusters per day CPU intensive Sensitivity to station outages –1 Cluster per day constructed from baselines Distributable across many CPUs Insensitive to station outages Developed and tested last year Implemented in April 2003 Moving to web services for antenna metadata New GIPSY version in Nov. 2003
4
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Solutions Complete through March 31, 2004. –Available on internet –Free network Raw solutions Loose covariance –Accounts for frame noise
5
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 REASoN Reminder of Our Goals How we are organized A High Level Requirement High Level Architecture Baseline Schedule Status
6
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 REASoN Goals Apply modern IT methodology within SCIGN to: –Produce and disseminate higher-level data products to a larger community Scientists Government agencies (Federal, State, and Local) Surveyors GIS professionals Product levels adopted by PBO
7
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 REASoN Goals Build on current capabilities within SCIGN for data archiving, information systems, and data analysis to disseminate the following products: –Geodetic position time series –Crustal motion models –Strain rate maps –Geologic fault models –Near-real-time earthquake response information –Geodetic reference systems for precise GIS and surveying Improve capabilities in –Archiving –End-user interfaces –Delivery mechanisms –Data modeling Open source project based on a redundant, multi-tiered “Virtual Archive” for GPS applications.
8
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 How we are organized Around Four systems –Product Input Seamless Archive Web services –GPS Data Processing GAMIT and GIPSY –Product Generation QOCA Based –Product Output Virtual Archive Web services –Meta data –Products Plus two NASA requirements –NASA SEEDs participation Standards Working Group –Open Source Project Virtual Archive
9
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 A High Level Requirement Need Processing centers and processes use the same input data Goal All processing retrieves data from a common source Objective Seamless Archive Web services Pull data at time of analysis Push results into archive Pull products from archive for distribution
10
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 High Level Architecture
11
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Architecture Interfaces Next slide shows –Functions on the diagonal –Interfaces on the off diagonals Who and what in the off diagonal boxes
12
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Architecture Interfaces
13
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Baseline Schedule (draft) Key milestones for the remainder of CY04 are: –Approved Task Plan based on negotiated funding profile (ASAP) –High level system requirements definition and design (Jul 04) –Design and development of modifications to QOCA for combined geodetic time series (Level-1) production software (Dec 04) –Design and development of automated GPS processing interfaces with GDPSES (Dec 04) Key milestones for CY05 - CY08 are: –Design, development, and implementation of automated Level 1 data products (Jul 05) –Design and development of modifications to QOCA for combined velocity field (Level-2) production software (Dec 05) –Design, development, and implementation of automated Level 2 data products (Jul 06) –Design and development of modifications to QOCA for geophysical parameter (Level-3) production software (Dec 06) –Design, development, and implementation of automated Level 3 data products (Jul 07) –Integrate Level-3 products with independent data products (Dec 07). –Incorporate PBO data into production process (Jul 08) –Deliver Adaptive Seamless Achive (Jul 08) –Deliver GPS Explorer (Jul 08) –Deliver Spatial Services (Jul 08) –Deliver Open Source Virtual Archive (Jul 08)
14
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Status Organized into initial teams Worked most of the high level architecture Working requirements and definitions of interfaces for CY04: –Processing –Archive –Web services Working formats –Internal product and data sharing –Prototyped XML schema and formats for metadata and time series products Product generation –Testing QOCA against GLOBK Loosely constrained agrees to sub-millimeter level –Initial modifications to QOCA for S/T filter has begun
15
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 Status Project library –Document sharing web site for team Configuration control Password protected https://scign-lib.jpl.nasa.gov NASA –Currently on startup funds –Draft task plan near completion for remaining funds PBO –Initial discussions have received a “Ho-Hum” response
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.