Download presentation
Presentation is loading. Please wait.
Published byDylan Dean Modified over 9 years ago
1
The Team Challenge
2
Objective to work cooperatively as a team with the use of the team member cards
3
The Team Challenge 1.Your team challenge is to design and create a bridge from the resources available that will span a gap of at least 60cm. 2.The winning bridge will be the one that can hold the largest weight. 3.Your group has a limited budget to purchase materials. Only the materials specialist can purchase materials. 4.The Materials Specialist may buy and sell between teams. 5.Should any teams draw the one spending the least will win. 6.Use your team worker cards appropriately 7.Use speaker cards during discussions 8.If you break the Health and Safety rules (6&7) the Health and Safety Executive will fine you. 9.If your team follows the Health and Safety rules well you might be awarded a bonus!
4
Timeline 20 minutes planning time before the warehouse opens 1 hour construction time 10 minutes testing time
5
Resources Fixing tape Steel pipes Pipe cutters You have a budget of £86…… Ready to start?
6
The Warehouse Steel Pipes – 30 - £10 Cutter hire - £20 for 10 mins Fixing tape - £40 per roll
7
Stock Market Crash!
8
The Warehouse Steel Pipes – 20 - £4 Cutter hire - £4 for 10 mins Fixing Tape- £5 per roll
9
The Warehouse Credit Crunch Steel Pipes – 20 - £30 Cutter hire - £45 for 10 mins Fixing tape - £40 per roll
10
Stock Market Boom!
11
The Tax Man
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.