STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino.

Similar presentations


Presentation on theme: "STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino."— Presentation transcript:

1 STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino - October 25 th - 26 th, 2012

2 STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Summary Overview oWorkplan Months 1-6 oCo-involvement/parallel investigations

3 STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Overview Involvement in WPs WP 5: Preparations in M1-6 so that UCC are ready to conduct testing with partner materials and assemblies when needed – equipment and personnel in place before M6 WPs 7,8: Initial pre-flight planning and strategies for project, together with all partners UCC will be in a position to contribute to WPs 1-3 within the first 6 months if required

4 STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Summary oOverview Workplan Months 1-6 Co-involvement/parallel investigations

5 STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Workplan Months 1-6  Full setup of half cell electrochemical suite for characterization of materials from the beginning (although not committed until M6)  Hiring key postdoctoral personnel for research work, PD from Dec 12  Feedback interaction with WP1 and 2 for cathode and anode materials – provision for bespoke investigations (electrochemical, analytical) prior to WP 4 and 5  Interactive experimental and consortium level planning for important first phase – advert, press, dissemination preparation (WP8)  Preparation for M6 consortium meeting in Cork (WP7)

6 STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Thank you for your attention