Download presentation
Presentation is loading. Please wait.
Published byKristopher Stevenson Modified over 9 years ago
1
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino - October 25 th - 26 th, 2012
2
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Summary Overview oWorkplan Months 1-6 oCo-involvement/parallel investigations
3
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Overview Involvement in WPs WP 5: Preparations in M1-6 so that UCC are ready to conduct testing with partner materials and assemblies when needed – equipment and personnel in place before M6 WPs 7,8: Initial pre-flight planning and strategies for project, together with all partners UCC will be in a position to contribute to WPs 1-3 within the first 6 months if required
4
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Summary oOverview Workplan Months 1-6 Co-involvement/parallel investigations
5
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Workplan Months 1-6 Full setup of half cell electrochemical suite for characterization of materials from the beginning (although not committed until M6) Hiring key postdoctoral personnel for research work, PD from Dec 12 Feedback interaction with WP1 and 2 for cathode and anode materials – provision for bespoke investigations (electrochemical, analytical) prior to WP 4 and 5 Interactive experimental and consortium level planning for important first phase – advert, press, dissemination preparation (WP8) Preparation for M6 consortium meeting in Cork (WP7)
6
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Thank you for your attention
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.