Download presentation
Presentation is loading. Please wait.
Published byAubrie Osborne Modified over 9 years ago
1
2010-2011 Preliminary Design Review
2
Completed practice launch New motor selection Corrected simulations Improved payload construction Increased outreach opportunities
3
Vehicle dimensions and layout Material choices Motor choice Expected results
5
Payload overview Sensor selection Construction of payload pod Separating and recovering payload
7
Hardware selection Previous and future testing Separation and recovery plan
8
Practice flight Launch day procedures Launch system Safety precautions
9
Current outreach opportunities Future outreach plans
10
Finalize payload design and begin construction Finalize airframe design and begin construction Begin launch procedure manual for current project Continue pushing forward with outreach
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.