Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Similar presentations


Presentation on theme: "WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11."— Presentation transcript:

1 WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11 Agenda Item: TP#10, Item 14, Reports from Working Groups

2 Issues for DECISION in TP © 2014 oneM2M Partners TP-2014-0022 2 N/A

3 Issues for DISCUSSION in TP Issue 1: Issue 2: © 2014 oneM2M Partners TP-2014-0022 3 N/A

4 Items for INFORMATION Latest contribution status can be found in – MAS-2014-0364R08-MAS_10_0_contribution_list © 2014 oneM2M Partners TP-2014-0022 4

5 Highlights TS-0001 Functional Architecture – Agreed contributions for ARC endorsement (see final status in ARC report): ARC-2014-1277R01mgmtCmd CR ARC-2014-1233R04Correction of node resource ARC-2014-1266remove-parameters-resource ARC-2014-1265R01modify-deviceCapability ARC-2014-1264R01modification_to_mgmtObj_procedure ARC-2014-1192R03Cleanup of editors notes and highlights in ASM and DMG CSFs ARC-2014-1268R02managements_to_nodes ARC-2014-1278R02Conversion_of_CMDH_Policies_to_mgmtObj ARC-2014-1286R03define mgmt objects for SCA resource ARC-2014-1269R02state-machine-for-sw-mgmt MAS-2014-0365R03App-ID Additional Clarification Text MAS-2014-0368Editorial updates to correct grammar and proper wording – Stage 2 clean up regarding management aspect is considered as 95% complete © 2013 oneM2M Partners TP-2014-0022 5

6 Highlights TS-0004 Protocol – Agreed contributions for PRO endorsement (see final status in PRO report): PRO-2014-0154R02mgmtCmd & execInstance – Stage 3 work on management is just beginning, further contributions are invited on data type definition common primitives & procedures regarding, ontologyRef Investigate changing from resource type to {mgmtObj} prototype © 2013 oneM2M Partners TP-2014-0022 6

7 Highlights TS-0005: Management enablement (OMA) – Agreed contributions: MAS-2014-0351R02Resource Mapping for OMA DM MAS-2014-0352R04DataType Identification Mapping for OMA DM MAS-2014-0355R01resource-mapping-for-management MAS-2014-0366R03DataType_Identification_Mapping_for_OMA_LWM2M MAS-2014-0367R03Resource Mapping for OMA LWM2M – Output version: v0.1.0 – Current status: draft (40%) – Milestone forecast: No change. TS-0006: Management enablement (BBF) – No input contribution. – Input version: v0.1.0 – Current status: draft (40%) – Milestone forecast: No change. © 2014 oneM2M Partners 7

8 Highlights TR-0007: Abstraction & Semantics TR – Agreed contributions: MAS-2014-0356proper_usage_terminologies_ABS_TR MAS-2014-0354R02Device+DeviceTemplate-Modelling MAS-2014-0353R01Architectural Considerations for Semantic Support MAS-2014-0359R01Key Issues on Semantics and Ontologies – Output version: v0.8.0 – Current status: Draft (60%) – Milestone forecast: No change. © 2014 oneM2M Partners 8

9 Open Issues Management Attribute injection (i.e. {mgmtObj} prototype)? – Investigate changing from resource type to {mgmtObj} prototype in stage 3 first – Potential CR to ARC TS 1.1 according to stage 3 development In the case that single resource mapped to multiple underying dm technologies (OMA DM 1.X/2.0, LWM2M, TR069), the mapping of attributes objectID and objectPath need FFS?? © 2014 oneM2M Partners 9

10 Open Action Items © 2014 oneM2M Partners TP-2014-0022 10 #Action Item DescriptionOwnerStatus A-WG5- 9.0-001 TS-0004: CMDH Policies data typeQualcommOPEN A-WG5- 9.0-002 TS-0004: resources schema, primitives, procedures Huawei, LGE, Qualcomm OPEN A-WG5- 9.0-003 TS-0004: resources schema, primitives, procedures IDCCOPEN A-WG5- 9.0-004 TS-0005: Mapping to DM1.xHuawei, LGEOPEN A-WG5- 9.0-005 TS-0005: Mapping to DM2.0LGE, GemaltoOPEN A-WG5- 9.0-006 TS-0005: Mapping to LWM2MLGE, Gemalto, Ericsson OPEN A-WG5- 9.0-007 TS-0005: New objects (CMDH Policies, charging policies)QualcommOPEN A-WG5- 9.0-008 TS-0006: Mapping to BBF TR069, New objects (CMDH Policies, charging policies) ALU, QualcommOPEN *Blue items are addressed in TP#10 and before

11 Open Action Items (new) #Action Item DescriptionOwnerStatus A-WG5- 10.0-001 to ensure oneM2M requirements are correctly shared with HGI / BBF Smart Home team on Device Template activity. NEC, OrangeOPEN A-WG5- 10.0-002 to put in the ARC issue list for further refinement of the terminology of 'instance' of resource to refer to the sub-class of resource, e.g. [CMDHPolicies]). NicolasOPEN A-WG5- 10.0-003 TR-0007: consistency check regarding the terminology of 'entity' vs. 'device' Martin (NEC)OPEN A-WG5- 10.0-004 TS-0006: draft recommendation of instantiating the resource uri (e.g. node name) based on the device/object instance names of underlying dm technologies. Tim (ALU)OPEN A-WG5- 10.0-005 TR-0007: lead the restructuring of TOCNEC, ModacomOPEN

12 Next Steps - Management May have further refinement on TS-0001 (Functional Architecture) jointly with WG2 on Management Aspects. Progress TS-0004 (Protocol) jointly with WG3 on Management Aspects. – Mangement data types, resource schema, primitives, procedures – See open AIs Progress TS-0005 (OMA) & TS-0006 (BBF) – Mapping of basic data types, identifiers, existing resources from TS- 0004, DM Server Interactions, New Objects (e.g. CMDH Policies) – See open Ais © 2014 oneM2M Partners 12

13 Next Steps – Abstraction & Semantics Progress TR-0007 (WI-0005: Abstraction & Semantics Study) – Restructuring – Develop common terminologies, levels/features/stages of semantic support – Converging on architectural impact based on ARC TS R1 © 2014 oneM2M Partners TP-2014-0022 13

14 Next Meetings / Calls Conference Calls – MAS#10.1 (mgmt): Apr 28th 2014, UTC 13:00-15:00 – MAS#10.2 (semantics): May 12th 2014, UTC 13:00-15:00 – PRO#10.4 (joint WG3): May 13th 2014, UTC 12:00-15:00 – MAS#10.3 (mgmt): May 19th 2014, UTC 13:00-15:00 – MAS#10.4 (joint WG3): May 26th 2014, UTC 13:00-15:00 Face-to-Face – MAS#11.0: Jun. 9-13, Xian, China © 2014 oneM2M Partners TP-2014-0022 14

15


Download ppt "WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11."

Similar presentations


Ads by Google