Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Technology of Transmutation TETRA - Preparation for FP6 - Presented by X. Cheng ADOPT meeting, 10.-11. December 2002 EC Building Batiment SDME, Brussel, Belgien
2
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Transmutation Technology in 5FP ASCHLIM CFD application to HLM (SCK) MEGAPIE-TEST Support for MEGAPIE Target (FZK) SPIRE Irradiation behavior of structural material (CEA) TECLA Technologies of Lead alloys (ENEA) Cluster TESTRA
3
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft First TETRA Working Group Meetings Objectives First contact of partners Discussion about the organization Preparation of the technical content Define short (near)-term actions Participants: First meeting at FZK (Sept. 12, 2002) FZK, CEA, CIEMAT, CNRS, ENEA, FANP, KTH, PSI, RUB, SCK, UoP, Second meeting at ENEA (Oct. 25, 2002) CEA, CIEMAT, ENEA, FZK, NRG, PSI
4
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft First TETRA Working Group Meetings Achievement Preliminary organization scheme Preliminary task list and task sheets Ranking criteria Short (near)-term actions Next actions Finalization of technical tasks (interaction with design requirements) and organization scheme Harmonization of resources
5
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Structure of the TETRA Working Group WP 5 Large scale integral tests WP 4 MEGAPIE post-test analysis WP 2 Advanced T-H & Measurement techniques WP 3 Material studies & HLM technology WP1 Project management & summary
6
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Structure of WP 3 WP 3.3 Material irradiation studies WP 3.1 Material selection & procurement WP 3.2 Corrosion protection & HLM technology WP 3 Material studies & HLM technology
7
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP I – Project management and summary Objectives Coordination of the working group Interaction with XADS design working group Subtasks 1.1 Project coordination 1.2 Project summary and recommendation
8
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP II – Advanced Thermal-hydraulics and measurement techniques Subtasks 2.1.1 Heat transfer in forced and natural convection 2.1.2 Two-phase flow 2.1.3 Interaction of LBE with water 2.2 Thermal-hydraulics of the active part of the window target 2.3 Thermal-hydraulics of the active part of the windowless target 2.4 Development of physical models and CFD validation 2.5 Measurement techniques
9
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP III.1: Material selection and procurement Subtasks 3.1.1 Material selection 3.1.2 Specification, quality assurance & procurment 3.1.3 Material aging 3.1.4 Characterisation of new materials (T92)
10
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP III.2: Corrosion protection and HLM technology Subtasks 3.2.1 Evaluation of corrosion kinetics 3.2.2 Development of corrosion barriers for high temperatures 3.2.3 Physical chemistry of lead alloy 3.2.4 Oxygen control and measurement techniques 3.2.5 Impurity measurement and removal 3.2.6 Material corrosion and mechanical properties under irradiation in the presence of lead alloy 3.2.7 Mechanical behavior of T91 in contact with lead alloy
11
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP III.3: Material irradiation studies Subtasks 3.2.1 Effect of spallation products on the material properties – implantation tests 3.3.2 Irradiation tests under neutron spectrum in fission reactor & PIE 3.3.3 Irradiation tests under proton-neutron mixed spectrum at SINQ facility & PIE 3.3.4 Modeling of irradiation damage in the spallation environment 3.3.5 Experimental studies on hardening and embrittlement after irradiation (nanometric scale)
12
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP IV – MEGAPIE post-test analysis Subtasks 4.1 Post tests analysis (PTA) 4.1.1 Thermal-hydraulics 4.1.2 Neutronics 4.1.3 System and components behaviour 4.1.4 Beam diagnostics 4.1.5 Instrumentation and safety systems 4.2 PIE 4.3 Procedures for irradiated LBE
13
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft WP V – Large scale integral tests Subtasks 5.1 Components group of primary system 5.2 Full scale spallation target module
14
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Task sheet example - Task No. And Title Objectives Tasks a) b) c) Contribution and budget requirement of partners Ranking C-1C-2C-3C-4C-5C-6Ranking InstitutionsTasksM-M/Budget required FZKA, c10 MM/20k€
15
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Ranking criteria CriteriaRankingweighting Deficiency & research needs 1-310 Requirement of European XADS 1-310 Requirement of long-term ADS program 1-35 ADS specific 1-35 Relevant for long-term nuclear technology 1-33 Time scale (4/4/4) 1-35