Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:

Similar presentations


Presentation on theme: "Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:"— Presentation transcript:

1

2 Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height: Building Height: 25m maximum Occupancy: Occupancy: 400 People maximum Office Requirement: › General Office Purpose › 70% Open Plan and 30% Cellular Full Disabled Access Materials and Energy should be produced locally

3 High levels of insulation  Walls < 0.15 W/m 2 K 'Thermal bridge free' construction Airtight building fabric  Maximum of 0.6 air changes per hour at 50 Pa High performance windows with insulated frames  Glazing < 0.8 W/m 2 K Space Heating/Cooling Energy  <15kWh/m 2 /annum Primary Energy Demand  <120kWh/m 2 /annum

4 -Dimensions : 28x28m -Glazed surface oriented South East -Atrium in order to bring maximum light inside the building -Shading in order to avoid over illumination and overheating

5 N

6 Air Supplied Air extracted Ground Heat Exchanger Mechanical Ventilation Heat Recovery (MVHR) : -Maximum flow rate : 32 000 m 3 /hour -Air change per hour per person : from 8 to 30 l/s/person -Fan consumption : 2W/l/s

7 Ceiling Smart LED : 43W 36 fittings in the open area 2 fittings in the each cellular office Occupancy sensors for cellular and toilets

8 300 lux on the working plan Variable intensity depending on the incoming light thanks to daylight sensors

9

10 To heat => hot water, to cool => cold water More cost effective and energy efficient than air conditioning

11 Total annual electricity demand = 125398 kWh 50% demand to be met by renewables = 62699 kWh

12 Rooftop PV flat 432.6m2 11.8% efficiency = 44395kWh Overhang PV flat 132m2 11.8% efficiency = 6433kWh (30% Shaded) Overhang PV vertical 132m2 11.8% efficiency = 9482kWh (30% Shaded) Rooftop PVT system flat 104.4m2 13% efficiency =11785kWh Increased efficiency as thermal system reduces operating temperature Total electricity generated = 72096kWh

13 Hot water demand 3150litres/day PVT thermal efficiency = 0.7 Absorption 85% as PV rather than glass 100 litres per panel 45 panels required Panel area 2.32m2 Total system size 104.4m2 http://www.goodenergy.co.uk/generate/choosing-your-technology/home-generation/solar-thermal/solar-thermal-faqs Additional hot water heating required during winter months 1071.9kWh 0.29kWh/m2/a Electrical emersion heater

14 WallsGround Floor SlabRoofGlazing Materials LCC GGBS Insitu Concrete Frame British Gypsum® Plaster Low Conductivity Teplo4 ™ Wall Ties SVP Insulation ECO Smart™ Sandstone Cladding LCC GGBS Insitu Concrete Slab Kingspan® Therma floor™ TF70 Insulation Damp Proof Membrane (Waterproofing) LCC GGBS Insitu Concrete Slab Kingspan® Therma roof™ TR26 LPC/FM Insulation Damp Proof Membrane (Waterproofing) Gypsum Plaster Atrium: A98 Atrium Glazing Units Office: Low Emissivity Triple Glazing Fully Insulated Frame Passive Standard 0.15 0.80 U-Value Achieved (W/m 2 K) 0.130.140.1120.79

15 Typical PracticeBest PracticePassive StandardOur Office Overall Energy (kWh/m 2 /annum) 22617812048.94 Cooling & Heating (kWh/m 2 /annum) 2091111511.87 Lighting (kWh/m 2 /annum) 5427-5.27 Office Equipment (kWh/m 2 /annum) 3123-8.95

16 Our OfficeEnergon Passive Office Overall Energy 4144.43 Cooling & Heating 12.1612.3 U-Value (W/m 2 K) Ground Floor Slab Roof Glass Roof Atrium Typical Office Windows Wall Construction 0.22 0.12 1.80 0.84 0.11 GF, 0.13 Office 0.14 0.112 0.79 0.13

17 Size increased from 25m x 25m to 28m x 28m -increase atrium size and allow more natural light to enter Pitch of roof – changed from angled to flat pitch was not feasible by exceeding the maximum height not enough light entering the atrium Overhangs designed to create shading Solar gains and low u-values of materials creating internal overheating PV installed on to overhangs Electrical demand exceeded 50% onsite generated requirement Change Ventilation Flow Rate Cooling was not sufficient so ac/h increased

18

19 Apply what was learned in the first semester How to use new software (i.e. Dialux, Dreamweaver, etc) How to present our ideas Work as a team

20 All details available on the website:  Project detailed per section  Presentations and calculations downloadable  Pictures  …

21

22 Area of Glazing = 660m 2 Transmittance = 0.57 South facing vertical Total Solar Heat Gain = 216110kWh January February March AprilMayJune July August September October November December

23 Green Building Store http://www.greenbuildingstore.co.uk/page--ecoplus- energy-efficient-glazing.html External shading overhangs/louvres Light shelf

24


Download ppt "Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:"

Similar presentations


Ads by Google