Download presentation
Presentation is loading. Please wait.
Published byBernice Smith Modified over 9 years ago
2
©1997 by M. Kostic Ch.4 (Ch.6 in current Text): Probability and Statistics Variations due to: Measurement System: Resolution and RepeatabilityMeasurement System: Resolution and Repeatability Meas. Procedure: RepeatabilityMeas. Procedure: Repeatability Measured Variable: Temporal & Spatial Var.Measured Variable: Temporal & Spatial Var.
3
©1997 by M. Kostic Statistical Measurement Theory Sample - a set of measured dataSample - a set of measured data Measurand - measured variableMeasurand - measured variable (True) mean value: (x’) x mean(True) mean value: (x’) x mean
4
©1997 by M. Kostic Mean Value and Uncertainty x’= x mean ± u x @ P% x mean is a P% probable estimate of x’ with uncertainty u x
5
©1997 by M. Kostic Probability-Density Function More dense Less dense Range
6
©1997 by M. Kostic Histogram-Frequency distribution K=7 intervals n j =7>5 1 3 4 2
7
©1997 by M. Kostic Mean value and Variance
8
©1997 by M. Kostic Infinite Statistics Probability-density function p(x) and Probability P% =(x-x’)/ dim’less deviationFor x=x’, =0 p(x)=dP/dx
9
©1997 by M. Kostic 68. 27% 95. 45% Normal-Gaussian distribution =(x-x’)/ 99. 73%
10
©1997 by M. Kostic Normal-Gaussian distribution Z 1 =1.02 ½P( z 1 =1.02 )=34.61% ½P( z 1 =1.02 )= ? Also, z 1 ( ½P =0.3461 ) =1.02 MathCAD file
11
©1997 by M. Kostic Finite Statistics Student-t distributionStudent-t distribution t( =9,P=50% ) =? Also, P( =9, t =0.703 )=50% and ( P =50%, t =0.703 )=9, P, t are related t =N-1 MathCAD file 50=P%
12
©1997 by M. Kostic Standard Deviation of the Means
13
©1997 by M. Kostic Standard Deviation of the Means (2) x i y x N color i x xx N S i=1 2 __ 1 1
14
©1997 by M. Kostic Pooled Statistics M replicates of N repeated measurements
15
©1997 by M. Kostic niyx ii,...2,1},,{:pointsdataGiven Least-Square Regression aaaaxfy y mjiic c )...,,...,,( :function)choice(our Arbitrary 10, a j foundbetocoefficientsarewhere :minimumbe should squareddeviationsofsumThe y(ydD i ici i i min) 2, 2 ni,...2,1 x i y i y ic, d i y(y ici ), y x
16
©1997 by M. Kostic Least-Square Regression (2) Click for Polynomial Curve-Fit Click for Arbitrary Curve-Fit
17
©1997 by M. Kostic Correlation Coefficient Click for Polynomial Curve-Fit Click for Arbitrary Curve-Fit If S xy =S y and S xy =0, respectively For the simplest, zeroth order polynomial fit. Coeff. of determination
18
©1997 by M. Kostic Data Outlier limit z OL z OL (%P in or %P out ) %P out (z OL ) %P in (z OL ) Usually z OL = 3 or z OL = z OL (P out = 0.5-P in =0.1/N) if number of data N is large. (For P out =1%, z OL =2.33) Keep data if within ± z OL otherwise REJECT DATA as Outliers
19
©1997 by M. Kostic Required #of Measurements
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.