Presentation is loading. Please wait.

Presentation is loading. Please wait.

DM_PPT_NP_v01 UTC Participant Survey Results Kathleen L Carr October 13, 2015.

Similar presentations


Presentation on theme: "DM_PPT_NP_v01 UTC Participant Survey Results Kathleen L Carr October 13, 2015."— Presentation transcript:

1 DM_PPT_NP_v01 UTC Participant Survey Results Kathleen L Carr October 13, 2015

2 DM_PPT_NP_v01 2 Response Rate 33 responses –22 DAACs –3 ESDIS Product Team –4 ESDIS –4 Other (EED, GCMD, Operations, Raytheon @NSIDC) Compare to average attendance at UTC = 33.6

3 DM_PPT_NP_v01 WHO IS THE UTC AUDIENCE?

4 DM_PPT_NP_v01 4 Responder Roles Top 3 –User Support –Systems Engineer –Science Operations “Other” –Science Writer –Metadata Specialist / Metadata Administrator / Manage Metadata –Data Analyst –Analyst –Web Developer –Archiving –User Services –Change/Problem Manager

5 DM_PPT_NP_v01 5 UTC Attendance Statistics

6 DM_PPT_NP_v01 WHAT ARE THE UTC INTERESTS?

7 DM_PPT_NP_v01 7 Products of Interest

8 DM_PPT_NP_v01 8 Products of Interest Other topics entered: –ACSI Survey (high level) –Worldview (not listed in survey choices) –NGAP, EED2 studies, Cross-cutting initiatives (e.g., relevancy ranking)

9 DM_PPT_NP_v01 9 Topics of Interest

10 DM_PPT_NP_v01 UTC INFORMATION SHARING

11 DM_PPT_NP_v01 11 Information Sources and UTC Minutes

12 DM_PPT_NP_v01 UTC MAILING LIST

13 DM_PPT_NP_v01 13 UTC Mailing List Usefulness and Frequency

14 DM_PPT_NP_v01 RECOMMENDATIONS

15 DM_PPT_NP_v01 15 Recommendations Make the meeting more interactive Present Special Topics –How By advance notice At the end of the meeting Approximately once per month –What topics Future Features DAAC Tools Other suggested topics

16 DM_PPT_NP_v01 16 Requested special topics Explain the difference between ECHO and CMR. Difference between PT vs UAT. Run through an ECC example. Earthdata Service Center Example of if/how a DAAC is using any of your APIs or shared code Reverb retirement plans Quick review of the mailing lists available. Quick review of the chat rooms IF available to DAACs.

17 DM_PPT_NP_v01 17 Requested special topics BEDI OPeNDAP development/implementation at DAACs What is the role of the CMR with respect to projects/providers who are expected to deliver ISO 19115 compliant metadata?

18 DM_PPT_NP_v01 18 Requested special topics NGAP Certain studies done in EED2, like the transfer one

19 DM_PPT_NP_v01 19 This work was supported by NASA/GSFC under Raytheon Co. contract number NNG10HP02C


Download ppt "DM_PPT_NP_v01 UTC Participant Survey Results Kathleen L Carr October 13, 2015."

Similar presentations


Ads by Google