Presentation is loading. Please wait.

Presentation is loading. Please wait.

LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.

Similar presentations


Presentation on theme: "LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL."— Presentation transcript:

1 LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL - LBNL - SLAC

2 LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 22 Charge Goals: Evaluate the readiness of coils, structure, assembly and test plan for LQS03 Committee: G. Ambrosio, H. Felice, A. Ghosh. Location: LBNL video-meeting room BNL and FNAL through video-mtg link IP#: 8852771 (back-up#: 8552771) Date and Time: February 21, 2012 from 8:30am to 2:30pm (Pacific Time) Link to talks: https://plone.uslarp.org/MagnetRD/longquad/meetings/fy12/lqs03rr/ Format: Internal review; everybody is invited to ask questions and make comments.

3 LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 33 Agenda (Pacific time)  Introduction and charge o Time: 8:30-8:40 (Giorgio Ambrosio)  Conductor: strands, cabling, insulation, and witness samples o Time: 8:40-9:00 (Dan Dietderich) o Time: 9:00-9:20 (Arup Ghosh) o Time: 9:20-9:40 (Vito Lombardo)  Coffee break: 9:40-10:00  Coils: fabrication data and tests – Coils #15, #17, and #19. o Time: 10:00-10:30(Fred Nobrega)  Coils: fabrication data and tests – Coils #16 and #18. o Time: 10:30-11:00(Jesse Schmalzle)  Coils: All coils qualification tests and heater connections o Time: 11:00-11:30(Ray Hafalia, Maxim Martchevskii)  Discussion of conductor and coils data o Time: 11:30-12:00  Lunch: 12:00-1:30  Structure and assembly plans o Time: 1:30-2:00pm (Helene Felice)  Test preparation and test plan o Time: 2:00-2:30pm(Guram Chlachidze)


Download ppt "LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL."

Similar presentations


Ads by Google