BERLinPro An ERL Demonstration facility at the HELMHOLTZ ZENTRUM BERLIN
2
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 2 Main components: 100MeV, 100mA beam Small emittance, rel. short bunches High current: to address needs of storage ring users Show energy recovery Explore limits of ERL (multiturn, injection energy) Show different operational modes: high current (100mA, 2ps), short pulses (10mA, 100fs), ??, => superiority of the ERL concept to storage rings BERLinPro: ERL demonstration facility to prepare the ground for a few GeV ERL @ Berlin-Adlershof Goal: SC-RF gun Booster module – Cornell development with minor modifications Merger: C-chicane, 4 rectangular dipoles Linac: based on Tesla technology, modified for high current Return arc: TBA Second loop option
3
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 3 Finances and time table : ‚go ahead‘ for gun development R&D money for gun development secured Further approval process for entire budget 2010 beam from 1.6 cell gun cavity in HoBiCaT Conceptual design 2011 Technical layout (TDR) 5 years after approval: first recirculated electrons
4
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 4 GUN DEVELOPMENT SRF Gun Return Arc Merger Section Main Linac SRF Module Spent Beam Beam Dump SRF Booster 1.5 MeV 5-10 MeV 100 MeV Beam Manipulation Undulator tests
5
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 5 BERLinPro gun: Staged approach A high brightness source which can deliver high average current and short pulses. Stage 1-Beam Dynamics: Produce beam with cold gun in existing HoBiCaT cryomodule. Nb cavity with Pb-coated cathode (J. Sekutowicz & Co), UV laser (MBI), sc solenoid and beam diagnostics. Stage 2-Cathode integration: Extend HoBiCaT bunker, new cryomodule, cathode preparation infrastructure. Produce 1 to 10 mA with CsK 2 Sb cathode, green laser (MBI). In parallel, test gun cavities and new RF coupler (>100kW) in HoBiCaT. Stage 3-High current operation: Build SRF gun for BERLinPro (high rep. rate) From J. Sekutowicz, Proc. of PAC09 Courtesy of Thorsten Kamps
6
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 6 Stage 1 setup in HoBiCaT 1.6 cell cavity, sc-solenoid, Helium supply Stage 1 diagnostic beam line View screens, stripline, current monitor, emittance measurement, energy measurement
7
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 7 HoBiCat preparations:
8
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 8 MERGER DESIGN CONSIDERATIONS SRF Gun Return Arc Merger Section Main Linac SRF Module Spent Beam Beam Dump SRF Booster 1.5 MeV 5-10 MeV 100 MeV Beam Manipulation Undulator tests
9
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 9 Zigzag chicane: (Brookhaven) Space charge forces: compatible with emittance compensation scheme Higher order dispersion: intrinsically cancelled by C-chicane with rectangular magnets equal focussing in both planes 2. order dispersion not 0 Small trajectory displacement Fixed relation D1/D2 „Geometrically challenging“ (vertical construction in Brookhaven) Easier to incorporate in machine Flexible drift lengths Offset adjustable by drift length Vertical focussing C-chicane:
10
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 10 ASTRA: Emittance for Zigzag / C- chicane for increasing bunch charge and different energy spread (correlated) C-chicane Zigzag Gaussian bunch: x,y = 1.0 mrad x,y = 1.0 mm z = 1.0 mm x,y = 20.0 m x,y = 0
11
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 11 Bunch lengthening in merger due to energy spread / space charge Effect is reduced when going to 10 MeV injection energy.
12
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 12 Emittance vrs. bunch length Gaussian bunch: E = 10 MeV x,y = 1.0 mrad x,y = 1.0 mm x,y = 20.0 m x,y = 0 E = 20keV Emittance depends strongly on bunch length: Charge zCompression 77pC6ps3 or more 10pC1ps10 or more 77pC 10pC
13
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 13 Lambertson magnet: Good idea?? Last merger dipole deflects high energy beam by up to 4° => extra chicane necessary Lambertson: High energy beam travels in field free region, injected low energy beam runs parallel Lambertson would reduce 4° to less than 0.14°, which is rather an orbit correction By Lars-Johan Lindgren, MAX-lab
14
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 14 L1 d d \ L20.4m0.8m1.2m 10mm1.40.70.5 20mm2.91.40.7 30mm4.32.11.4 [°] as a function of d, L1 0.025rad = 1.432deg. High energy beam deflected by 1/10: 0.14° mean 2.5cm offset after 10m linac Steering for HE beam is necessary Place for HE optical elements before Lambertson Steerer Last merger dipole Lambertson?
15
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 15 Linac: SRF Gun Return Arc Merger Section Main Linac SRF Module Spent Beam Beam Dump SRF Booster 1.5 MeV 5-10 MeV 100 MeV Beam Manipulation Undulator tests
16
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 16 100 MeV Linac: 1.3 GHz Start with multicell TESLA and adapt this for CW and high current Single cryomodule with 6-7 cavities 7 cells/cavity (?) Application „Verbundforschungsantrag“: federal funding for a collaboration with Univ. Rostock and Dortmund for the calculation of HOM Options for HOMs: Ferrite loads, waveguide dampers HoBiCaT test
17
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 17 RECIRCULATOR - ARC SRF Gun Return Arc Merger Section Main Linac SRF Module Spent Beam Beam Dump SRF Booster 1.5 MeV 5-10 MeV 100 MeV Beam Manipulation Undulator tests
18
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 18 Path length management: Short bunches require pathlength adjustment Second loop option: 100MeV: 1. turn: L=(n+1/2) rf 200MeV: 1. turn: L= n rf ( rf /2=12cm) Variable injection energy alters path length in merger & splitter for HE beam 20 o bend @ 5-20MeV = 1-4 o @ 100MeV => 0.5cm t E E = E 0 cos ( t + 0 ) X = – 2 0 = head with higher E gives compression with “normal” arc R 56 chirp at deceleration doubles inacceptable energy spread L = 2 rf =2-3cm deg. Courtesy of Michael Abo-Bakr
19
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 19 3 Approaches to pathlength adjustment: 1 - Brookhaven: Build arc on sledge, mechanical adjustment very precise expensive slow 2 - C-chicane long @ 100MeV: 2-3m CSR – bunches are short 3 - Incorporate into the arc 11 00 00 11 KK SBSB X0X0 X1X1 D0D0 D 1, 3 [ °] 2 [° ] K [°] x max /c m 60 4.86.3 45902.94.5 Angle and offset for 6cm additional pathlength Courtesy of Michael Abo-Bakr
20
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 20 Radiation safety requirements: Different ‚league‘ than storage rings Drive costs =>drive beamloss requirements Permissable beamloss:<1e-5? => Too little space for shielding above ground => Consider construction underground reduced shielding, vibrations and temperature fluctuations at comparable costs
21
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 21 BESSY II Cryogenic plant
22
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 22
23
March, 1st, 2010, Bettina Kuske, FLS 2010, SLAC, USA BERLinPro: An ERL demonstration facility at the HELMHOLTZ ZENTRUM BERLIN 23 Building: All dimensions preliminary 55m6.4m 6.0m 15m Storage Ring Hall