Proposed Demolition Processing Pilot Project
3
Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed 2006 to Present All Concrete, Brick and Blacktop processed as aggregate 2006 - Present Shingles Re-use 2007 – 2011 NMR Pilot Project 4 weeks - 2008
4
Waste Categories Wood – shipped to Minnesota Power – Biomass Metal – marketed by contractor Aggregates – separated, crushed marketed/utilized locally Shingles – separated, processed work with Public works and MNDOT Cardboard – marketed through recycling center Residuals – landfilled at RLF, General Waste and Waste Management
8
Project Location
10
Recommendation Request SWSC approval Request Board approval Proceed with 3 Month Pilot Project Evaluate numbers/success weekly Continue for additional 3 months based on numbers Review Contractor Report Get MPCA permit modification/approval Draft Request for Bids after 6 month project for long term program development.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.