Download presentation
Presentation is loading. Please wait.
Published byTobias Ernest White Modified over 9 years ago
1
Improvement-Driven Fees National Impact Fee Roundtable Arlington, VA October 5, 2006
2
Session Outline Clancy Mullen (15 minutes) Conceptual framework Randy Young (15 minutes) Road impact fee example Joe Colgan (15 minutes) Alternative taxonomy Panel Discussion (15 minutes) Q&A (15 minutes)
3
Overview Alternative Methodologies Plan-Based Standard-Based Essential Characteristics Plan Requirements in State Laws Advantages and Disadvantages
4
Alternative Methodologies Plan-Based (Improvements-Driven) Standard-Based (Demand-Driven, Consumption-Based, Buy-in, Incremental Expansion)
5
Essential Characteristics of Plan-Based Methodologies Geographic LOS standard All roads function at LOS D or better Drainage adequate for 100-year storm A park within one mile of every house Minimum 5-minute fire response time A 10-year to 20-year master plan Growth projections for planning period Improvements needed to serve growth at adopted/desired standard Fee = Total Cost divided by Growth
6
Essential Characteristics of Standard-Based Methodologies System-wide LOS standard Park acres/1,000 population Road system VMC/VMT ratio Fire station sq. ft./dwelling unit Gallons/day per single-family equivalent Permanent school stations per student Existing facilities cost per demand unit Total cost / capacity = unit cost Fee = unit cost x units needed
7
Comparative Typical Features Plan-BasedStandard-Based List of projects mandatoryList of projects optional Spend only on listed projectsAny eligible improvement Add projects when plan updatedAdd projects any time Desired LOS = deficienciesExisting or desired LOS No charge existing capacityTypically no excess Charge for future excessCharge only for needed
8
State Law Requirements 27 states have enabling acts 30% no requirements (FL, AZ, CO, WA..) 20% require only a list (AR, OR, UT, WI..) 50% require growth projections Typical requirements Growth projections List of needed projects and costs Only attributable share used in fee calc. TX: max fee = growth costs/growth
9
Advantages/Disadvantages Plan-BasedStandard-Based Certainty based on planFlexibility to adapt to change Legitimacy based on planValidity not tied to plan Can use geographic LOSSystem-wide LOS simpler Captures marginal costLong-term avg. = marg. cost
10
When Plan-Based is Warranted Complex, geographic-based LOS Master plans available Community approaching build-out
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.