Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic PANS-OPS Procedure Design.

Similar presentations


Presentation on theme: "The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic PANS-OPS Procedure Design."— Presentation transcript:

1 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic PANS-OPS Procedure Design Training Vientiane, 12 - 30 September 2011 OPENING 09:45-10:00, 12 September

2 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam ✈ Opening Remarks by JICA Lao Office ✈ Welcome Remarks by DCA ✈ Introduction of Japanese Experts & Counterparts ✈ Schedule of Lectures and Exercise ✈ Others 2

3 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 3 Mr. Shinji HARA (MEng, MASc) Deputy Manager, Flight Procedure Design, Airspace Group, First Division, NTT DATA i Corporation Responsible for flight procedure design (conventional and RNAV), airspace planning and training schemes in domestic and oversea market Ms. Naomi KODA (MEng) Chief Flight Procedure Designer, Flight Procedure Design, Airspace Group, First Division, NTT DATA i Corporation Responsible for flight procedure design (conventional and RNAV), airspace planning and training schemes in domestic and oversea market

4 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Objective 1To acquire Basic knowledge on PANS-OPS for Flight Procedure Design Objective 2To ensure that the participants get sufficient skill and knowledge to join the next Training for PBN Flight Procedure Design 4 Please keep these OBJECTIVES in mind during the training program

5 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 5 ✈ Lecture & desk exercises PANS-OPS as a main textbook PowerPoint to indicate right part of PANS-OPS ✈ Overall exercise Design a series of Approach and Departure Procedures of an airport Group Work

6 Main Textbook is YOUR ICAO Doc 8168, PANS-OPS Vol. II : Take notes as much as you want and bring them back to daily work PowerPoint presentation is just an aid to refer to PANS-OPS PowerPoint PANS-OPS Part 1, Section2, Chapter 3, para 3.3.3 means P1S2C3, 3.3.3

7 Exercise (week 3) will be conducted as a group work Work on Paper Topographical Map (mainly 1/50,000) Classical Way!

8 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 8 DAY 1: Monday, 12 September 09:45-10:00: Opening Introduction of Japanese Experts & Counterparts Schedule of Lectures and Exercise 10:00-12:00: Session 1 – Approach Procedures (General) 13:30-16:30: Session 2 – Approach Procedures (General) DAY 2 and beyond 09:00-12:00 & 13:30-16:30 Any change to schedule and administrative matters will be advised to participants by JICA Experts

9 WEEK 1 12 SEP13 SEP14 SEP15 SEP16 SEP (admin.) Orientation APCH (General) Turn - Parameter - Turn Area ACFT category Arrival Initial APCH - Straight - RVSL Base Turn (+ exercise) Racetrack (+ exercise) Intermediate Segment Final Segment WEEK 2 19 SEP20 SEP21 SEP22 SEP23 SEP Missed APCH (+ exercise) Departure - general - Straight - Turning Departure -average path MSA Circling Holding (+ exercise) Publication & Charting Recap Preparation for exercise WEEK 3 26 SEP27 SEP28 SEP29 SEP30 SEP Exercise -APCH -Missed APCH Exercise -Holding Exercise -Depature Exercise -MSA -Circling Presentation (Presentation, cont’d) (admin.)

10 WEEK 1 12 SEP13 SEP14 SEP15 SEP16 SEP GENERAL RULEAPCH WEEK 2 19 SEP20 SEP21 SEP22 SEP23 SEP APCH (cont’d) DEPOTHERS WEEK 3 26 SEP27 SEP28 SEP29 SEP30 SEP Exercise (APCH, DEP, MSA, etc) + Final Presentation Lecture Exercise

11 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Certificate of Attendance ✈ Certificate will be issued to participants who have attended more than 95% of Programs and achieved 80% (or higher) of examinations, which will be conducted during the Training to assess the level of understanding (Participants will also be evaluated by JICA), and not for 2 Lao Observers. ✈ Certificate is jointly signed by JICA Short-term Expert and Project Leader Evaluation/Assessment of the Training ✈ Feedback from Counterparts participating in the Training is essential for JICA and Project to improve our programs. No Interpretation/Translation Services 11

12 Achievement by Participants are Evaluated (1) Progress Test Light Paper Exam to evaluate if participants have acquired ESSENTIAL part of PANS-OPS Ad-hoc Basis during lectures (2) Final Examination Presentation on your design for Exercise Oral Q & A about the result Understandings on PANS-OPS Validity of your determination on your design 80% Achievement required to be certified!

13 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 13 Counterparts are requested to provide their Feedback by ✈ Submitting Group Evaluation/Assessment (in Lao) everyday after Lectures/Workshop (Group Leader summarize feedback of all participants). Group Evaluation Form will be provided to the Group Leader every morning. ✈ Submitting Individual Evaluation/Assessment (in Lao) after Session 9 on Day 5. Individual Evaluation Form will be provided to the Participants morning of Day 5. ✈ Copy of Group Evaluation and Individual Evaluation Forms submitted will be made available to DCA for records.

14 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 14 Do not be an observer! Participate actively!! Get involved!!!


Download ppt "The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic PANS-OPS Procedure Design."

Similar presentations


Ads by Google