Download presentation
Presentation is loading. Please wait.
Published byKory Hutchinson Modified over 9 years ago
1
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during 2011-12. Due to shortage Wk 10 &11 UI disbursement not done UTILITY LC AMOUNT (Rs.Crs) Default for year AP10.22009-10 Puducherry12009-10 TN32.84Current year TALCHER II1.4Current year
2
DELAY IN WEEKLY SEM DATA RECEIPT DURING OCT 2011 AndhrapradeshKarnatakaKeralaTamilnadu Stations No.of occass ions Stations No.of occass ions Statio ns No.of occassi ons Statio ns No.of occass ions Kothaguda m 3Kadakola1Idukki1 Udumal pet 3 Mamidipal ly 1Bellary1 SV chatram 2 Mehboobn agar 1Sedam1 Arni1 KTPP1 Yerandana hally 1 Kalpaka 1
3
Time drift report receipt status: ANDHRAPRADESH: No station is sending KARNATAKA: Only Nelamangala sending – not regular TAMILNADU Only Gumdipundi, Hosur & Kuzhithurai sending regularly. PONDICHERRY Resumed sending ISGS STATIONS: NTPC: RSTPS not regular NLC : NLC II and Expansion I not regular. MAPS : Not sending
4
Mock Exercise for the implementation of the RRF CERC directed to start mock exercise for the implementation of RRF w.e.f. 01.07.2011. SLRDC wrote to Beneficiaries on 05-07-11 requesting to make arrangements Letter dt.05.07.11 Letter dt.01.08.11
5
Actions to be taken by states States to furnish: a list of the wind farms and solar farms eligible for RRF provision. details of Contracts along with contracted price to the concerned RPC and RLDC through the respective SLDC Forecasting data for wind and solar generation to the concerned SLDC/RLDC and RPC 15-minute block-wise data of schedule and actual generation from wind farm generation/ Solar Generation plants as recorded in the Special Energy Meters on a weekly basis
6
Solar Schedules vetting Solar generators may be advised to give availability of the generator, weather forecasting, solar insolation, season and normal solar generation curve etc. so as to enable SRLDC to vet the Generation schedules
7
Identify Nodal Officer Furnish Details of Nodal developer who shall be responsible for coordinating for the collective capacity on behalf of the group of developers on issues like SCADA, metering, scheduling, UI charges, RRF, forecasting data with the concerned SLDC/RLDC. States to identify a nodal officer for coordinating on the above matters.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.