Presentation is loading. Please wait.

Presentation is loading. Please wait.

04.12.2015 Dr. Erik Evtimov, Senior Legal Adviser & Project Coordinator CIM/SMGS UNECE Workshop on Trade Facilitation, Odessa, 1 June 2011 Electronic Consignment.

Similar presentations


Presentation on theme: "04.12.2015 Dr. Erik Evtimov, Senior Legal Adviser & Project Coordinator CIM/SMGS UNECE Workshop on Trade Facilitation, Odessa, 1 June 2011 Electronic Consignment."— Presentation transcript:

1 04.12.2015 Dr. Erik Evtimov, Senior Legal Adviser & Project Coordinator CIM/SMGS UNECE Workshop on Trade Facilitation, Odessa, 1 June 2011 Electronic Consignment Note CIM/SMGS

2 15-12-04 2 Manual: GLV CIM/SMGS and Appendix 22 SMGS D. Electronic Consignment note CIM – Article 6 § 9: Principle of the functional equivalent SMGS – Article 7 § 14: Principle of the contractual agreement between carrier and customer EDI – Agreement: Legal specifications (CIT/OSJD) Functional specifications (CIT/OSJD) Technical specifications (Raildata/CIT/OSJD)

3 15-12-04 3 Electronic consignment note CIM/SMGS (1) Legal & Functional Specifications: –Agreed on the level of the project “Legal interoperability CIM/SMGS between CIT and OSJD –Recommendation for the RU implementing the Electronic consignment note CIM/SMGS (“Viking” train or “Electronic train” of the CCTT)

4 15-12-04 4 Electronic consignment note CIM/SMGS (2) Technical specifications: -Finalized by the Raildata, CIT and OSJD -Agreed on the level of the Project on 8 July 2009 trough the Steering Group CIM/SMGS -Practical implementation

5 15-12-045 Electronic consignment note CIM/SMGS (3) Implementations RAILDATA Relationships between the RU -Technical specifications - Implementation of the different interfaces e-RailFreight functional and legal specifications Railway undertakings (RU) Relationships between railway undertakings, customers and customs -Technical specifications -Implementation of the different interfaces -Organizational issues Trough the participating RUTrough the participating RU Tests:Tests: -CIM Consignment note beginning of 2011 -No experiences till now with the Electronic consignment note CIM/SMGS

6 11-05-17 6 Implementations: e-RailFreight a short summary The project’s objectives: to develop EDI processes for the exchange of consignment note data, to reduce administrative costs, to make the consignment note data being exchanged more accurate and to speed up the exchange of data.

7 e-RailFreight – future development of the system Priority given to electronic procedures, paper processes becoming the exception Reduction of the functions which the consignment note can play CIT Expert Group Next revision of the CIM Uniform Rules 7 11-05-17


Download ppt "04.12.2015 Dr. Erik Evtimov, Senior Legal Adviser & Project Coordinator CIM/SMGS UNECE Workshop on Trade Facilitation, Odessa, 1 June 2011 Electronic Consignment."

Similar presentations


Ads by Google